BLD98-01840
| INSP - Foundation | 9/22/1998 | 9/22/1998 | 9/22/1998 12:00:00 AM | A | NR |
|
|
conf w/ owner...permit to be voided as new plan/contractor to be used...must resubmit all documents for new review. discussed previously w/ front desk & Jim Toombs.
|
BLD98-02331
| INSP - Framing/Rough-in | 9/22/1998 | 9/22/1998 | 9/22/1998 12:00:00 AM | A | PART |
|
|
conf w/ bldr...add straps at post beam connectons; insul rim
|
BLD98-02718
| INSP - Framing/Rough-in | 9/22/1998 | 9/22/1998 | 9/22/1998 12:00:00 AM | A | NR |
|
|
ok to ins. ext walls at add'n prior to framing per 340
|
BLD98-02331
| INSP - Energy code compliance | 9/22/1998 | 9/22/1998 | 9/22/1998 12:00:00 AM | P | PASS |
|
|
TIM ###-#### REINSP c/n on insul ok
|
BLD98-02012
| INSP - Framing/Rough-in | 9/22/1998 | 9/22/1998 | 9/22/1998 12:00:00 AM | P | PART |
|
|
joe/ beniton constr; floor framing: verbal to strap pony walls...still need eng'g report for change in brg locations from pads to pony wall.
|
MEC98-02620
| INSP - Final | 9/22/1998 | 9/22/1998 | 9/22/1998 12:00:00 AM | P | PASS |
|
|
ok
|
MEC98-02620
| INSP - Final | 9/22/1998 | 9/22/1998 | 9/22/1998 12:00:00 AM | P | PASS |
|
|
ok
|
BLD98-01298
| INSP - Framing/Rough-in | 9/22/1998 | 9/22/1998 | 9/22/1998 12:00:00 AM | P | FAIL |
|
|
john ###-#### for fr insp c/n; straps, add'l brace panel. ok to insulate
|