Inspections for the day of: Tuesday, September 22, 1998.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD98-01840 INSP - Foundation9/22/19989/22/19989/22/1998 12:00:00 AMANR
conf w/ owner...permit to be voided as new plan/contractor to be used...must resubmit all documents for new review. discussed previously w/ front desk & Jim Toombs.
BLD98-02331 INSP - Framing/Rough-in9/22/19989/22/19989/22/1998 12:00:00 AMAPART
conf w/ bldr...add straps at post beam connectons; insul rim
BLD98-02718 INSP - Framing/Rough-in9/22/19989/22/19989/22/1998 12:00:00 AMANR
ok to ins. ext walls at add'n prior to framing per 340
BLD98-02331 INSP - Energy code compliance9/22/19989/22/19989/22/1998 12:00:00 AMPPASS
TIM ###-#### REINSP c/n on insul ok
BLD98-02012 INSP - Framing/Rough-in9/22/19989/22/19989/22/1998 12:00:00 AMPPART
joe/ beniton constr; floor framing: verbal to strap pony walls...still need eng'g report for change in brg locations from pads to pony wall.
MEC98-02620 INSP - Final9/22/19989/22/19989/22/1998 12:00:00 AMPPASS
ok
MEC98-02620 INSP - Final9/22/19989/22/19989/22/1998 12:00:00 AMPPASS
ok
BLD98-01298 INSP - Framing/Rough-in9/22/19989/22/19989/22/1998 12:00:00 AMPFAIL
john ###-#### for fr insp c/n; straps, add'l brace panel. ok to insulate