BLD00-01903
| BLD-Framing/Rough-in | 9/20/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | A | PART |
|
|
DOUG-- ###-#### SHEAR WLL INSP exterior pannel nailling ok for cover. 9/22/2000 9:54:52 AM
|
BLD99-03541
| BLD-Framing/Rough-in | 9/21/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | A | PASS |
|
|
Bob Cafferty, ###-####
|
BLD00-01867
| BLD-Footing | 9/21/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/21/2000 at 11:31:03. Contact: ###-####. placed with special insp. pending report. slab 2nd half. 9/22/2000 2:27:40 PM
|
MEC00-02063
| Final | 9/21/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | A | NR |
|
|
Empire Heating ###-#### key is above the front door for the back doorc/nposted 9/22/2000 11:03:05 AM
|
BLD00-02333
| BLD-Final | 9/21/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | A | PART |
|
|
JEFF ###-#### FN l/c isued 9/22/2000 9:29:28 AM
|
BLD00-01765
| BLD-Framing/Rough-in | 9/21/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | A | FAIL |
|
|
JEFF ###-#### FR c/n fbi joist cut /sealents not applied at framing insp. / rim joist at stair wall not accessable to insulate exterior wall/ return air duct 2 nd floor exterior wall cavity not insulated/ under stair fur out needs fire blk. and backer to get 5/8 gyp atchment for stair protection./do not insulate with out reinspection. 9/22/2000 10:23:00 AM
|
BLD00-02044
| BLD-Final | 9/22/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/22/2000 at 07:21:49. Contact: ###-####. no access and phone number supplied will not work for contat of responable party for insp. 9/22/2000 9:13:08 AM
|
BLD00-01473
| BLD-Framing/Rough-in | 9/22/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/22/2000 at 07:29:30. Contact: ###-####. stairs corrected. 9/22/2000 5:24:37 PM
|
BLD99-03588
| BLD-Framing/Rough-in | 9/22/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | P | FAIL |
|
|
ceiling shawn ###-#### c/n lights supports/ gyp protection type 3 1hr. 9/25/2000 10:17:15 AM
|
BLD99-03588
| BLD-Framing/Rough-in | 9/22/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | P | FAIL |
|
|
ceiling shawn ###-#### c/n lights supports/ gyp protection type 3 1hr. 9/25/2000 10:17:15 AM
|
BLD00-01726
| BLD-Concrete | 9/21/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/21/2000 at 16:43:09. Contact: ###-####.
|
BLD00-01563
| BLD-Concrete | 9/18/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | P | FAIL |
|
|
Ken boyd ###-#### colums ar basement elavator pit remove sona forms to observe consolidation. 9/22/2000 3:38:55 PM
|
BLD00-02342
| BLD-Conference | 9/20/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | P | PASS |
|
|
FOR CONF JEFF -###-#### per plan reviewers scope of work final ok pending ele final. 9/22/2000 5:02:33 PM
|
BLD00-01618
| BLD-Final | 9/21/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 09/21/2000 at 15:42:28. Contact: ###-####. via phone call. 9/22/2000 5:07:09 PM
|
BLD00-01862
| BLD-Framing/Rough-in | 9/21/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | P | CANC |
|
|
ceiling grid Gene ###-#### late pm
|
BLD00-00884
| BLD-Final | 9/21/2000 | 9/22/2000 | 9/21/2000 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 09/21/2000 at 12:13:04. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/21/2000 at 12:18:58.
|