ELE00-03502
| Final | 9/21/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/21/2000 at 12:47:57. Contact: ###-####. temporary occupancy-phase 1. 9/22/2000 5:08:29 PM
|
ELE00-01686
| Final | 9/21/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | A | PASS |
|
|
###-####. completed. 9/22/2000 5:08:58 PM
|
ELE00-02832
| Final | 9/21/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | A | PART |
|
|
Mike ###-####. temporary occupancy only. 9/22/2000 5:10:15 PM
|
ELE00-03720
| Electrical Rough-In | 9/21/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/21/2000 at 16:15:54. Contact: ###-####. area of needed inspection covered over with sheetrock. contacted contractor for removal. 9/22/2000 5:07:02 PM
|
ELE00-01633
| Electrical Rough-In | 9/21/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/21/2000 at 19:22:05. Contact: ###-####. kitchen and diningroom ele r/i. 9/22/2000 5:09:35 PM
|
ELE00-02998
| Final | 9/22/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | P | FAIL |
|
|
###-####. no access; left card, called contractor to reschedule. 9/22/2000 5:19:05 PM
|
ELE00-03073
| Final | 9/22/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | P | PASS |
|
|
2nd floor ###-#### suite 201. completed. 9/22/2000 5:20:59 PM
|
ELE00-03720
| Electrical Rough-In | 9/22/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/22/2000 at 09:08:09. Contact: ###-####. ok, corrections completed. copier room, walls ele r/i . 9/22/2000 5:18:02 PM 9/22/2000 5:20:18 PM
|
ELE00-03433
| Electrical Rough-In | 9/21/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | P | PART |
|
|
CONF INSP== CALL 1ST BEFORE INSP ###-#### OR CELL ###-#### BILL. p.v.c. in trench, groundwork. 9/22/2000 5:13:58 PM
|
ELE99-01707
| Final | 9/21/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 09/21/2000 at 18:05:08. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/22/2000 at 08:39:09.
|
ELE00-03647
| Electrical Rough-In | 9/21/2000 | 9/22/2000 | 9/22/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/21/2000 at 11:45:42. Contact: ###-####. ele r/i; walls and ceiling-center core area, 1st three floors. 9/22/2000 5:12:22 PM
|