FIR03-00093
| INSP-Sprinkler Rough-in | 9/18/2003 | 9/22/2003 | 9/22/2003 12:00:00 AM | A | FAIL |
|
|
###-#### chris basement: need hangers at end of pipe and fix busted hangers; standpipe hose outlets to be 3-5 ft from floor; beams creating obstructions; 6 inch main shifted to the north next to 3 inch due to beams; additional EQ on riser 9/22/2003 3:57:26 PM
|
FIR03-00194
| INSP-Final Inspection | 9/19/2003 | 9/22/2003 | 9/22/2003 12:00:00 AM | A | FAIL |
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need CPVC piping installed per listing in unfinished areas or cover with sheetrock on ceiling 9/22/2003 11:50:20 AM
|
FIR03-00486
| INSP-Sprinkler Rough-in/Hydro | 9/19/2003 | 9/22/2003 | 9/22/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 9/19/2003 at 2:36:21 PM. Contact: ###-####. flex heads are installed instead of hardpipe as shown on plans;Troy will contact Debest and request data on thi stype of flex; requested with fitter another inspection when he starts to attach the heads to the grid 9/22/2003 9:39:59 AM
|
FIR03-00544
| INSP-Final Inspection | 9/19/2003 | 9/22/2003 | 9/22/2003 12:00:00 AM | A | PASS |
|
|
bryan; Phone #: ###-#### Internet Inspection Request from: Annette Moore oaky to cover; will verify annual sprinkler inspection is current at final as riser room door was locked 9/22/2003 8:11:49 AM
|
FIR03-00462
| INSP-Sprinkler Rough-in/Hydro | 9/22/2003 | 9/22/2003 | 9/22/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 9/22/2003 at 7:38:39 AM. Contact: ###-####. okay to cover tented areas; do not cover family room ceiling where there are beam obstructions and heads installed in bottom of beams; faxed replay back to Debest last Wednesday in reference to beam obstrcution with Sam Rogers concurrence that heads to be installed at ceiling and not the bottom of beams 9/22/2003 3:10:43 PM
|