FIR04-00374
| FIR-Aging Inspection | 9/22/2004 | 9/22/2004 | 9/22/2004 12:00:00 AM | | NR |
|
|
work in progress 9/22/2004 8:23:40 AM
|
FIR04-00553
| INSP-Final Inspection | 9/21/2004 | 9/22/2004 | 9/22/2004 12:00:00 AM | A | FAIL |
|
|
No approved plans on site. The phone number given when permit was set up was the office phone number. I spoke to the secretary and let her know I was doing the inspection 9/22/2004 10:52:36 AM
|
BLD04-01039
| FIRE-Final Inspection | 9/21/2004 | 9/22/2004 | 9/22/2004 12:00:00 AM | A | PART |
|
|
Phase 1 area is ok to occupy. Per Karen in Maintenance and Jeff who is the superintendant the emergency lighting circuits were tested by George with Eidem yesterday. Work for the covered walkway won't begin until november. 9/22/2004 9:07:36 AM
|
FIR04-00368
| INSP-Sprinkler Rough-in | 9/22/2004 | 9/22/2004 | 9/22/2004 12:00:00 AM | P | FAIL |
|
|
I inspected the first floor area west of the elevator and found hangers that have not been corrected yet, combustible space with no upright protection and earth quake bracing missing. See approved plans for exact locations. 9/22/2004 2:51:44 PM
|
FIR04-00546
| INSP-Sprinkler Rough-in/Hydro | 9/22/2004 | 9/22/2004 | 9/22/2004 12:00:00 AM | P | PART |
|
|
Inspection was just for the underground. Piping is ok to bury from the tap to the curbing just outside of the building. 9/22/2004 4:11:44 PM
|
FIR04-00497
| INSP-Final Inspection | 9/22/2004 | 9/22/2004 | 9/22/2004 12:00:00 AM | P | FAIL |
|
|
The electrical appliances under the large hood did not shut down and holes in the hood need pluged 9/22/2004 3:30:56 PM
|
FIR04-00499
| INSP-Final Inspection | 9/22/2004 | 9/22/2004 | 9/22/2004 12:00:00 AM | P | FAIL |
|
|
The electrical appliances under the large hood did not shut down and holes in the hood need pluged 9/22/2004 3:31:03 PM
|