Inspections for the day of: Wednesday, September 22, 2004.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00374 FIR-Aging Inspection9/22/20049/22/20049/22/2004 12:00:00 AM NR
work in progress 9/22/2004 8:23:40 AM
FIR04-00553 INSP-Final Inspection9/21/20049/22/20049/22/2004 12:00:00 AMAFAIL
No approved plans on site. The phone number given when permit was set up was the office phone number. I spoke to the secretary and let her know I was doing the inspection 9/22/2004 10:52:36 AM
BLD04-01039 FIRE-Final Inspection9/21/20049/22/20049/22/2004 12:00:00 AMAPART
Phase 1 area is ok to occupy. Per Karen in Maintenance and Jeff who is the superintendant the emergency lighting circuits were tested by George with Eidem yesterday. Work for the covered walkway won't begin until november. 9/22/2004 9:07:36 AM
FIR04-00368 INSP-Sprinkler Rough-in9/22/20049/22/20049/22/2004 12:00:00 AMPFAIL
I inspected the first floor area west of the elevator and found hangers that have not been corrected yet, combustible space with no upright protection and earth quake bracing missing. See approved plans for exact locations. 9/22/2004 2:51:44 PM
FIR04-00546 INSP-Sprinkler Rough-in/Hydro9/22/20049/22/20049/22/2004 12:00:00 AMPPART
Inspection was just for the underground. Piping is ok to bury from the tap to the curbing just outside of the building. 9/22/2004 4:11:44 PM
FIR04-00497 INSP-Final Inspection9/22/20049/22/20049/22/2004 12:00:00 AMPFAIL
The electrical appliances under the large hood did not shut down and holes in the hood need pluged 9/22/2004 3:30:56 PM
FIR04-00499 INSP-Final Inspection9/22/20049/22/20049/22/2004 12:00:00 AMPFAIL
The electrical appliances under the large hood did not shut down and holes in the hood need pluged 9/22/2004 3:31:03 PM