BLD05-00128
| BLD-Other | 9/22/2006 | 9/22/2006 | 9/22/2006 12:00:00 AM | P | PART |
|
|
Site conference with Bill Strack and Larry Sundell on required resubmittals reflecting changes approved by historic commision and as builts, also discussed stair requirements, rise/run. Phone conference with engineer on south wall requirements to meet shear and fire rating. OSB will be removed gyp rock installed and OSB applied over gyp and nailed at 4" oc.. 1st floor slab to scheduled to be placed 9/25/06.
|