Inspections for the day of: Friday, September 22, 2006.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS06-00154 MIS-Aging Inspection9/22/20069/22/20069/25/2006 9:26:38 AM NR
BLD06-00007 BLD-Framing/Rough-in9/22/20069/22/20069/22/2006 5:05:24 PMPPASS
###-#### - kent. Upper tower framing.
BLD06-01463 BLD-Framing/Rough-in9/21/20069/22/20069/22/2006 4:46:51 PMPCANC
mark Note: rebar; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. cnc by contractor.
BLD06-01839 BLD-Framing/Rough-in9/21/20069/22/20069/22/2006 3:21:08 PMPPART
chuck - call prior to meet there; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. ok to insul. Needs to provide the correct truss eng.
BLD05-02167 BLD-Energy code compliance9/21/20069/22/20069/22/2006 2:40:43 PMPPASS
kevin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD06-01815 BLD-Footing9/22/20069/22/20069/22/2006 2:22:22 PMPPART
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. 2nd half of perimeter footing for basement wall. Interior footings west half.
BLD06-00700 BLD-Conference9/22/20069/22/20069/22/2006 1:42:23 PMPCANC
ron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD05-00317 BLD-Framing/Rough-in9/21/20069/22/20069/22/2006 11:54:24 AMAPART
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Framing ast bowling alley(needs to add blocking at shearwall) Interior steel stud framed walls for offices at nw corner of bldg.(ok to insul and rock thisn area) Inspected 2hr seperation wall. Wall is one sided. Contractor needs to provide UL listings for penetrations and ele. needs to install putty pads\ were applkicable.
BLD06-01775 BLD-Framing/Rough-in9/21/20069/22/20069/22/2006 10:43:58 AMAPASS
tom; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Interior steel stud framing at existing office.
BLD06-02127 BLD-Energy code compliance9/21/20069/22/20069/22/2006 9:39:45 AMAPASS
harold; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Needs ton fireblock mech chase at ceilings.
BLD06-02128 BLD-Energy code compliance9/21/20069/22/20069/22/2006 9:39:03 AMAPASS
harold; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Needs to fireblock mech chase at ceilings.
BLD06-00758 BLD-Final9/20/20069/22/20069/22/2006 9:18:47 AMAPASS
jeff - call prior to meet there; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD06-00758 DOC - Permit Finaled9/22/20069/22/20069/22/2006 9:18:18 AMPPASS