Inspections for the day of: Tuesday, September 22, 2009.
Number of inspections: 11
Percentage of inspections complete: 91 %
Percentage of inspections not complete: 9 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00450 Site Final9/22/20099/22/20099/22/2009 5:23:18 PMPNR
Talked to Ken (RP)..........Need to remove all excavated stockpiled dirt, and stabilize all denuded soils.
BLD09-01197 BLD-Final9/22/20099/22/20099/22/2009 5:20:50 PMPPASS
ken Phone #: ###-####
C/C issued
BLD09-01197 DOC - Permit Finaled9/22/20099/22/20099/22/2009 5:20:07 PMPPASS
BLD09-01386 BLD-Footing9/22/20099/22/20099/22/2009 3:40:05 PMPPART
dane Phone #: ###-####
ESC09-00401 Site Preparation9/22/20099/22/20099/22/2009 3:39:18 PMPPART
Talked to RP..........Need to sweep all hard surfaces after excavation. Will check at foundation inspection.
BLD08-01869 BLD-Final9/21/20099/22/20099/22/2009 11:45:01 AMAPASS
Paul-please call prior to inspection Phone #: ###-####
C/C issued
BLD08-01869 DOC - Permit Finaled9/22/20099/22/20099/22/2009 11:44:41 AMPPASS
ESC09-00401 Site Final9/22/20099/22/20099/22/2009 11:44:18 AMPCANC
NR
ESC09-00371 Site Final9/22/20099/22/20099/22/2009 11:39:11 AMPNR
BLD09-00991 BLD-Final9/21/20099/22/20099/22/2009 11:38:53 AMANR
Jared Phone #: ###-####
ESC09-00584 Site Preparation9/22/20099/22/2009