FIR08-00830
| INSP-Sprinkler Rough-in | 9/22/2009 | 9/22/2009 | 9/22/2009 3:48:37 PM | P | PASS |
|
|
The 24 hour air test on the first floor dry riser was started at 11:00am with 44psi on the guage.
|
BLD07-02222
| FIRE-Final Inspection | 9/22/2009 | 9/22/2009 | 9/22/2009 3:47:32 PM | P | PASS |
|
|
Life safety passed.
|
BLD09-01305
| FIRE-Final Inspection | 9/21/2009 | 9/22/2009 | 9/22/2009 12:34:03 PM | A | FAIL |
|
|
Repair the emergency light in the corridor above the mens restroom and the emergency light above the south facing exteriror exit doors.
|
BLD09-01570
| FIRE-Final Inspection | 9/21/2009 | 9/22/2009 | 9/22/2009 12:24:47 PM | A | PASS |
|
|
life safety passed
|