Inspections for the day of: Tuesday, September 22, 2015.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorThomas Walsh
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00792 INSP-Sprinkler Rough-in9/21/20159/22/20159/22/2015 3:19:33 PMPPART
Rough to cover inspection for Bldg. H 1st floor - drop tile areas only. PASSED
NOTE: All hard lids for this floor already inspected, therefore rough inspection for this entire floor is completed.
BLD13-00189 FIRE-Final Inspection9/22/20159/22/20159/22/2015 3:16:29 PMPPART
Fire life-safety inspection for Bldg. J.
Emergency lighting and exit sign test off of generator - OK
Smoke doors installed and operational.
Egress doors, with magnetic door locking hardware still being installed - not tested this visit.
For final sign off, need to complete fire sprinklers and fire alarm finals, need building address posted, need one adiitional fire extinguisher near laundry room, and egress doors tested with fire alarm interface.
Suggest that Boise Fire be contacted to lock building keys into Knox box, which is installed.
FIR14-00683 INSP-Sprinkler Rough-in/Hydro9/22/20159/22/20159/22/2015 3:09:48 PMPPART
Completion of 24 hour air test for dry- pipe system (Bldg. J) - PASSED