Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-02827 Final9/21/20169/22/20169/22/2016 2:33:02 PMPPASS
DA Davidson space Phone #: ###-#### Inspection requested via web by steve ragan
This space actually marked 1800 other tenant in 1801. No one knows where future 1803 will be. Attached to BLD16-02961. Wall dividing individual offices in 1800 Final ok
ELE16-02981 Electrical Rough-In9/21/20169/22/20169/22/2016 2:13:40 PMPPASS
In lobby, left of elevator lobby, concierge area Phone #: ###-#### Inspection requested via web by steve ragan
Permit mislabelled. 1st floor unit 110
Correct BLD. Wall rough in ok cover
ELE16-01750 Final9/21/20169/22/20169/22/2016 1:41:13 PMPPART
Randy. Phone #: ###-#### Inspection requested via web by Sean DeLacy
All equipment shall be present for final. Check GFCI protection on customer side of bar, some were some were not.
Temp final for training
ELE16-01838 Final9/21/20169/22/20169/22/2016 12:27:19 PMAFAIL
Level 3 Stack 1,2,3,4 Power Branch Circuit Panels, Equip. Conn., Outlets, Office Furniture. LV Systems Phone #: ###-#### Inspection requested via web by Tom Betty

110.3- Furniture connections between each piece shall be complete. Panel 31A 21, 23, 25 not working. 31A 13, 15, 17 not working.
300.15- All boxes installed shall have covers. Low volt card reader, internet interface, misc.
300.15- Funiture covers missing and loose.
300.21- All penetrations in firewalls shall be sealed electrical and non electrical.
392.60- Cable trays and ladder racks bonding shall be complete.
422.30- Hardwired appliances shall have a disconnecting means. 110.25 lock out acceptable.
605.5- Office furniture installation shall be complete. Misc. not connected and level 3 stack 1 no furniture installed
ELE16-01838 Conference9/22/20169/22/20169/22/2016 12:25:55 PMPDONE
Level 3 Stack 1,2,3,4 Power Branch Circuit Panels, Equip. Conn., Outlets, Office Furniture. LV Systems Phone #: ###-#### Inspection requested via web by Tom Betty
Levels 2 and 3 stack 1, 2, 3, 4 lighting complete.
ELE15-01348 Final9/21/20169/22/20169/22/2016 12:24:27 PMAFAIL
Level 3 Stack 1,2,3,4 Power Electrical Rooms, Restrooms, IDF Rooms, Vestibules. Branch Circuit Panels and Circuits to Equip, outlets, Phone #: ###-#### Inspection requested via web by Tom Betty
110.3- Furniture connections between each piece shall be complete. Panel 31A 21, 23, 25 not working. 31A 13, 15, 17 not working.
300.15- All boxes installed shall have covers. Low volt card reader, internet interface, misc.
300.15- Funiture covers missing and loose.
300.21- All penetrations in firewalls shall be sealed electrical and non electrical.
392.60- Cable trays and ladder racks bonding shall be complete.
422.30- Hardwired appliances shall have a disconnecting means. 110.25 lock out acceptable.
605.5- Office furniture installation shall be complete. Misc. not connected and level 3 stack 1 no furniture installed
ELE16-02723 Final9/21/20169/22/20169/22/2016 9:25:17 AMAPASS
Sam is Contact Phone #: ###-#### Inspection requested via web by Lori Stout
No card posted. Final ok
ELE16-02009 Final9/22/20169/22/20169/22/2016 8:46:00 AMAPASS
Lock box code 6363

Phone #: ###-#### Inspection requested via web by Robert Schroder Final ok
ELE16-02981 Final9/21/20169/22/20169/21/2016 5:05:54 PMPCANC
DA Davidson space Phone #: ###-#### >> Inspection requested via web by steve ragan Inspection cancelled from web by: steve ragan