BLD16-01617
| BLD-Foundation | 9/22/2016 | 9/22/2016 | 9/22/2016 3:31:49 PM | P | PART |
|
|
Jason-pour time 4:00 Phone #: ###-####. Work in progress. Specia inspector wil be on site.
|
BLD14-03070
| BLD-Energy code compliance | 9/22/2016 | 9/22/2016 | 9/22/2016 3:08:58 PM | P | PASS |
|
|
Cody Phone #: ###-####. 1st, 2nd, 3rd. floor sother most six units.
|
BLD12-03170
| BLD-Conference | 9/22/2016 | 9/22/2016 | 9/22/2016 2:03:08 PM | P | DONE |
|
|
Verify status. Give 5 day notice or pending legal action. 5 day notice posted. Also called and spoke to Jonathan Welch. I told him that he had 5 day notice posted. Jonathan noted that he would call for buikding final for friday the 23rd.
|
BLD16-01288
| BLD-Framing/Rough-in | 9/22/2016 | 9/22/2016 | 9/22/2016 2:01:13 PM | P | NR |
|
|
Please call either way... pass or fail // Andy Phone #: ###-####
|
BLD16-03446
| BLD-Other | 9/22/2016 | 9/22/2016 | 9/22/2016 1:44:02 PM | P | PASS |
|
|
Mfg home block and tie inspection. Please call ###-#### prior to inspection.
Phone #: ###-#### Inspection requested via web by Ashleigh Meligan
|
BLD16-03234
| BLD-Framing/Rough-in | 9/21/2016 | 9/22/2016 | 9/22/2016 10:37:26 AM | A | PASS |
|
|
Chad Phone #: ###-####
|
BLD16-03234
| BLD-Energy code compliance | 9/21/2016 | 9/22/2016 | 9/22/2016 10:37:10 AM | A | PASS |
|
|
Call half hour before to meet there Insulation // Chad Phone #: ###-####
|
BLD16-00473
| BLD-Foundation | 9/21/2016 | 9/22/2016 | 9/22/2016 9:17:47 AM | A | PASS |
|
|
Joe-stem wall-pour time 12:30 Phone #: ###-####. Gridlines 8.3 to 12 and E to H.
|