ELE17-02897
| Electrical Rough-In | 9/21/2017 | 9/22/2017 | 9/22/2017 1:59:16 PM | P | PASS |
|
|
Walls are ready for inspection. Overhead inspection to follow at later date. Inspection requested via web by Kurt Carlson Walls only minus conference room ok cover
|
ELE17-00457
| Final | 9/22/2017 | 9/22/2017 | 9/22/2017 1:32:22 PM | P | PASS |
|
|
Scott Phone #: ###-#### Porch final ok
|
ELE17-01800
| Electrical Rough-In | 9/22/2017 | 9/22/2017 | 9/22/2017 1:32:00 PM | P | CANC |
|
|
Scott Phone #: ###-#### Service schedule for monday
|
ELE17-03044
| Electrical Rough-In | 9/21/2017 | 9/22/2017 | 9/22/2017 12:45:05 PM | P | FAIL |
|
|
Call George if any questions Phone #: ###-#### Inspection requested via web by Christian Kilpatrick No one on site re-schedule requested......
|
ELE17-02207
| Final | 9/19/2017 | 9/22/2017 | 9/22/2017 12:25:37 PM | P | PASS |
|
|
PLEASE CONTACT PINGNAN AT ###-#### 10 MINUTES BEFORE. HE IS OWNER BUT NOT OCCUPANT AND NEEDS TO DRIVE OVER THERE TO MEET YOU, THE INSPECTOR Phone #: ###-#### Inspection requested via web by jamie berg Corrections fixed final ok
|
ELE17-03027
| Final | 9/21/2017 | 9/22/2017 | 9/22/2017 11:35:34 AM | A | FAIL |
|
|
solar power system is ready for a final inspection Phone #: ###-#### Inspection requested via web by todd cline No BLD issued for solar array system
|
ELE17-03143
| Temporary Service | 9/22/2017 | 9/22/2017 | 9/22/2017 10:40:33 AM | P | CANC |
|
|
Reinspection for afternoon Phone #: ###-#### >> Inspection requested via web by Kevin Perez Inspection cancelled from web by: Kevin Perez
|
ELE17-01225
| Final | 9/21/2017 | 9/22/2017 | 9/22/2017 10:04:29 AM | A | PART |
|
|
Inspection requested via web by Mark Morgan Final ok
|
ELE17-03159
| Electrical Rough-In | 9/21/2017 | 9/22/2017 | 9/22/2017 9:15:27 AM | A | PASS |
|
|
Looking for exterior wall inspection so they can dry in the house Phone #: ###-#### Inspection requested via web by Brandon Blackham Exterior walls only at this time ok to cover Interior was not complete
|
ELE17-03143
| Temporary Service | 9/20/2017 | 9/22/2017 | 9/22/2017 9:14:36 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Kevin Perez All temporary power shall have GFCI protection (240 V for job trailer)
|
ELE17-02997
| Final | 9/21/2017 | 9/22/2017 | 9/22/2017 8:46:00 AM | A | PASS |
|
|
Inspection requested via web by Mark Morgan service change final only ok
|