BLD17-01449
| BLD-Conference | 9/22/2017 | 9/22/2017 | 9/22/2017 4:36:29 PM | P | DONE |
|
|
Jim Phone #: ###-####. Reviewed UL listing for 3M putty pads for membrane protection of 3hr. fire barier wall. Per the listing, The puuty pads will only achieve a maxiumum of 2hr rating. Contractor will pursue with 3m on getting an engineer judgement for alternate to achieve the 3hr. rating and submit to building official for approval.
|
BLD17-02189
| BLD-Ceiling Grid Inspection | 9/22/2017 | 9/22/2017 | 9/22/2017 2:32:38 PM | P | PASS |
|
|
Please call Nic a half hour before inspection. Phone #: ###-#### Inspection requested via web by Nic van Diepen
|
BLD16-02758
| BLD-Foundation | 9/22/2017 | 9/22/2017 | 9/22/2017 2:11:08 PM | P | PASS |
|
|
Sam-foundation-insulation Phone #: ###-####
|
BLD16-02759
| BLD-Foundation | 9/22/2017 | 9/22/2017 | 9/22/2017 2:10:58 PM | P | PASS |
|
|
Sam-foundation-insulation Phone #: ###-####
|
BLD16-04474
| BLD-Foundation | 9/22/2017 | 9/22/2017 | 9/22/2017 2:10:48 PM | P | PASS |
|
|
Sam-foundation-insulation Phone #: ###-####
|
BLD16-04473
| BLD-Foundation | 9/22/2017 | 9/22/2017 | 9/22/2017 2:10:12 PM | P | PASS |
|
|
Sam-foundation-insulation Phone #: ###-####
|
BLD17-03408
| BLD-Final | 9/22/2017 | 9/22/2017 | 9/22/2017 1:26:44 PM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Scott Tennant
|
BLD17-03408
| DOC - Permit Finaled | 9/22/2017 | 9/22/2017 | 9/22/2017 1:26:25 PM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances
|
BLD16-02949
| BLD-Aging Inspection | 9/22/2017 | 9/22/2017 | 9/22/2017 9:16:29 AM | | PEND |
|
|
Pending fire.
|
BLD16-02950
| BLD-Aging Inspection | 9/22/2017 | 9/22/2017 | 9/22/2017 9:16:13 AM | | PEND |
|
|
Pending fire.
|
BLD17-03105
| BLD-Framing/Rough-in | 9/21/2017 | 9/22/2017 | 9/22/2017 9:11:46 AM | A | PASS |
|
|
Matt Phone #: ###-####. Interior steel stud frmaed wall ok.
|
ESC17-00708
| Site Final | 9/22/2017 | 9/22/2017 | 9/22/2017 8:48:31 AM | A | DONE |
|
|
|
ESC17-00708
| DOC - Permit Finaled | 9/22/2017 | 9/22/2017 | 9/22/2017 8:48:23 AM | P | PASS |
|
|
|
BLD17-01801
| BLD-Final | 9/21/2017 | 9/22/2017 | 9/22/2017 8:48:15 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tom Wells. Driveway and landiings have been placed.
|
BLD17-01801
| DOC - Permit Finaled | 9/22/2017 | 9/22/2017 | 9/22/2017 8:47:50 AM | P | PASS |
|
|
|
BLD17-02066
| BLD-Footing | 9/21/2017 | 9/22/2017 | 9/22/2017 8:20:18 AM | A | PASS |
|
|
Please schedule for first thing AM. Interior shovel footings before Flatwork pour.
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Interior thickend footings ok.
|
BLD17-01140
| BLD-Footing | 9/21/2017 | 9/22/2017 | 9/22/2017 12:00:00 AM | A | CANC |
|
|
will have special inspection from MTI on site Phone #: ###-#### >> Inspection requested via web by Cassandra Hessing
|
MIS17-00248
| BLD-Conference | 8/22/2017 | 9/22/2017 | | A | |
|
|
Check on status...
|
BLD17-01388
| BLD-Foundation | 9/21/2017 | 9/22/2017 | | P | |
|
|
Rebar // Ross Phone #: ###-####
|