PLM99-03266
| Plumbing Rough-in | 9/23/1999 | 9/23/1999 | 9/23/1999 12:00:00 AM | | PASS |
|
|
remodel \ one sink and one water closet. This is a R/I only final
|
PLM99-03255
| Groundwork | 9/22/1999 | 9/23/1999 | 9/23/1999 12:00:00 AM | A | FAIL |
|
|
###-#### groundwork Not ready
|
PLM99-03100
| Plumbing Rough-in | 9/22/1999 | 9/23/1999 | 9/23/1999 12:00:00 AM | A | PASS |
|
|
mary ###-#### need RP on stream unit pan drain on it if installed in ceiling
|
PLM99-02455
| Final | 9/22/1999 | 9/23/1999 | 9/23/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/22/1999 at 15:20:46. Contact: ###-####.
|
PLM99-03177
| Final | 9/22/1999 | 9/23/1999 | 9/23/1999 12:00:00 AM | A | PASS |
|
|
waterline final ron ###-####
|
PLM99-03258
| Final | 9/22/1999 | 9/23/1999 | 9/23/1999 12:00:00 AM | A | PASS |
|
|
ROD-- ###-#### BACKFLOW INSP
|
PLM99-03155
| Final | 9/23/1999 | 9/23/1999 | 9/23/1999 12:00:00 AM | P | PASS |
|
|
W/S ONLY PAIGE ###-#### REINSPECT
|
PLM99-03264
| Plumbing Rough-in | 9/23/1999 | 9/23/1999 | 9/23/1999 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/23/1999 at 11:04:35. Contact: ###-####.
|