Inspections for the day of: Monday, September 23, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01352 BLD-Conference9/18/20029/23/20029/27/2002 12:00:00 AMAPART
follow up SWO follow up SWO..need Jim Schmer's ok 9/29/2002 3:43:19 PM
BLD02-00055 BLD-Conference9/20/20029/23/20029/23/2002 12:00:00 AMAPASS
WIP, hvac may be redesigned...slow. 9/23/2002 10:39:55 AM
BLD02-00505 BLD-Final9/20/20029/23/20029/23/2002 12:00:00 AMANR
wanted pm 9/23/2002 11:35:43 AM
BLD02-01877 BLD-Wall cover9/23/20029/23/20029/23/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 09/23/2002 at 07:34:19. Contact: ###-####....need elec ok'd, has c/n. 9/23/2002 2:39:16 PM
BLD02-01883 BLD-Framing/Rough-in9/23/20029/23/20029/23/2002 12:00:00 AMPFAIL
Phone #: ###-#### Internet Inspection Request from: Amy Lawson; need seismic bracing for grid & hvac permit/insp. 9/23/2002 2:54:42 PM
BLD02-00505 BLD-Final9/23/20029/23/20029/23/2002 12:00:00 AMPNR
###-#### call Mike prior to going ...need card w/ sig's of p&z 9/29/2002 3:41:59 PM
BLD02-01883 BLD-Conference9/23/20029/23/20029/23/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/23/2002 at 08:41:18. Contact: ###-####...w/ builder & framer, need hvac permit & seismic for grid. 9/24/2002 2:10:47 PM
BLD02-01937 BLD-Framing/Rough-in9/23/20029/23/20029/23/2002 12:00:00 AMPPASS
###-####; beams added, c/n ok. 9/23/2002 2:39:46 PM
BLD02-00505 BLD-Final9/23/20029/23/20029/23/2002 12:00:00 AMPFAIL
need verify p&z ok, ok for t/o... 9/23/2002 12:04:54 PM
BLD02-01352 BLD-Conference9/18/20029/23/20029/23/2002 12:00:00 AMPPASS
re swo...unable to contact, has elec r/i ok sticker???prior swo issued 9/23/2002 3:45:17 PM