PLM01-03407
| Final | 9/20/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | A | PART |
|
|
9/23/2002 need to permit and inspect sprinkler backflow device before final on duplex 9/23/2002 1:53:35 PM
|
PLM02-02909
| Sprinkler (Final) | 9/20/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | A | PART |
|
|
###-#### robert tie in ok -need plugs, for test port,s 9/23/2002 12:37:35 PM
|
PLM02-02546
| Plumbing Rough-in | 9/20/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | A | PART |
|
|
SHARON; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie-- ALSO PRESSURE TEST???? pressure test on med gas test ok water and drain,s and vent,s on north west corner test ok 9/23/2002 10:51:59 AM
|
PLM02-02801
| Plumbing Rough-in | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/23/2002 at 07:20:27. Contact: ###-####.
|
PLM02-02865
| Plumbing Rough-in | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/23/2002 at 08:32:29. Contact: ###-####. test failed on D.W.V need to correct reverse grade on 2 inch drain line in washer area need to provide access or turn cleanout around for island sink vent need to support drain,s in crawl every 4 feet 9/23/2002 4:57:27 PM
|
PLM02-02855
| Sprinkler (Final) | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | PASS |
|
|
KENNY; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
PLM02-02065
| Final | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/23/2002 at 11:12:34. Contact: ###-####. need to expose drain for upstair,s unfinished lav remove panel for jetted tub inspection called contractor will recall when ready 9/23/2002 2:48:09 PM
|