BLD02-01277
| BLD-Framing/Rough-in | 9/20/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | A | FAIL |
|
|
###-####. need to complete c/n. 9/23/2002 1:42:53 PM
|
BLD02-01844
| BLD-Wall cover | 9/20/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/20/2002 at 18:08:34. Contact: ###-####.grid ceiling. 9/23/2002 1:02:04 PM
|
BLD02-01360
| BLD-Final | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | PASS |
|
|
JENNY; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie.appears ok work complete. 9/23/2002 1:43:57 PM
|
BLD01-01403
| BLD-Final | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | PASS |
|
|
Steve, ###-#### - let Cathy know if approved, she has the card. 9/23/2002 2:01:08 PM. Ok perm oc . assuming all required signatures are on card. 9/23/2002 2:01:54 PM
|
BLD02-01703
| BLD-Framing/Rough-in | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/23/2002 at 10:24:21. Contact: ###-####.c/n items ok . Needs vapor barrier at upper florr and basement wall insulation as shown on aproved plans. 9/23/2002 2:22:59 PM
|
BLD02-01325
| BLD-Framing/Rough-in | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | PART |
|
|
partial; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung exterior walls. 9/23/2002 4:02:14 PM
|
BLD02-02022
| BLD-Energy code compliance | 9/19/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | NR |
|
|
###-#### john . not ready called contractor and told him to recall.as still insulating no inspection done. 9/23/2002 3:11:55 PM
|