Inspections for the day of: Monday, September 23, 2002.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01277 BLD-Framing/Rough-in9/20/20029/23/20029/23/2002 12:00:00 AMAFAIL
###-####. need to complete c/n. 9/23/2002 1:42:53 PM
BLD02-01844 BLD-Wall cover9/20/20029/23/20029/23/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/20/2002 at 18:08:34. Contact: ###-####.grid ceiling. 9/23/2002 1:02:04 PM
BLD02-01360 BLD-Final9/23/20029/23/20029/23/2002 12:00:00 AMPPASS
JENNY; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie.appears ok work complete. 9/23/2002 1:43:57 PM
BLD01-01403 BLD-Final9/23/20029/23/20029/23/2002 12:00:00 AMPPASS
Steve, ###-#### - let Cathy know if approved, she has the card. 9/23/2002 2:01:08 PM. Ok perm oc . assuming all required signatures are on card. 9/23/2002 2:01:54 PM
BLD02-01703 BLD-Framing/Rough-in9/23/20029/23/20029/23/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/23/2002 at 10:24:21. Contact: ###-####.c/n items ok . Needs vapor barrier at upper florr and basement wall insulation as shown on aproved plans. 9/23/2002 2:22:59 PM
BLD02-01325 BLD-Framing/Rough-in9/23/20029/23/20029/23/2002 12:00:00 AMPPART
partial; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung exterior walls. 9/23/2002 4:02:14 PM
BLD02-02022 BLD-Energy code compliance9/19/20029/23/20029/23/2002 12:00:00 AMPNR
###-#### john . not ready called contractor and told him to recall.as still insulating no inspection done. 9/23/2002 3:11:55 PM