Inspections for the day of: Monday, September 23, 2002.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-02659 Rough-in9/19/20029/23/20029/23/2002 12:00:00 AMAPART
PLEASE CALL DENTON BEFORE INSPECTION. THANKS!; Phone #: ###-#### Internet Inspection Request from: RaChelle Meister...*2684 9/20/2002 3:38:13 PM all r/i ok except to check range vent...ok to insulate all but range..gas size ok and holding pressure 9/23/2002 9:32:59 AM
MEC02-01950 Final9/19/20029/23/20029/23/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 09/19/2002 at 14:26:11. Contact: ###-####.
MEC02-00375 Final9/20/20029/23/20029/23/2002 12:00:00 AMANR
maple grove and mitchell 9/23/2002 1:31:19 PM range exhaust 9/24/2002 7:50:15 AM
MEC02-02403 Final9/23/20029/23/20029/23/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 09/23/2002 at 07:46:56. Contact: ###-####...betweeen maple grove and mitchell 9/23/2002 1:30:26 PM left correction notice on flex duct connections..standards 6-3 of the umc 9/23/2002 2:48:20 PM
MEC02-02678 Pressure Test9/23/20029/23/20029/23/2002 12:00:00 AMPPASS
###-####.. 9/24/2002 7:49:49 AM
MEC02-02680 Final9/23/20029/23/20029/23/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/23/2002 at 10:08:49. Contact: ###-####.
MEC02-02643 Rough-in9/23/20029/23/20029/23/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 09/23/2002 at 10:40:35. Contact: ###-####.
MEC02-02643 Pressure Test9/23/20029/23/20029/23/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 09/23/2002 at 10:41:01. Contact: ###-####.