BLD02-01692
| BLD-Framing/Rough-in | 9/20/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/20/2002 at 15:13:51. Contact: . C/N posted--ok to insulate. 9/23/2002 9:24:43 AM
|
BLD02-01607
| BLD-Other | 9/20/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 09/20/2002 at 15:15:25. Contact: . Cancelled by contractor--not ready. 9/23/2002 10:47:18 AM
|
BLD02-01649
| BLD-Energy code compliance | 9/22/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/22/2002 at 12:29:13. Contact: ###-####. South side addition ok to cover 9/23/2002 11:43:02 AM
|
MEC02-02670
| Pressure Test | 9/20/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 09/20/2002 at 12:53:19. Contact: ###-####. Cancelled by inspector--will perform at p.m framing. 9/23/2002 10:22:46 AM
|
BLD02-01732
| BLD-Framing/Rough-in | 9/20/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/20/2002 at 13:38:48. Contact: ###-####. C/N--No approved plans on site. 9/23/2002 10:02:14 AM
|
BLD02-01579
| BLD-Framing/Rough-in | 9/20/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | PART |
|
|
###-#### C/N--Prior c/n items completed--replacement of post under beams needed (under utility room)--Ok to insulate. 9/23/2002 3:03:08 PM
|
BLD02-01603
| BLD-Footing | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/23/2002 at 07:55:28. Contact: ###-####. wip--setbacks ok--check rear of garage at rear column to see if changes were made from approved plans--if so--eng. is needed--contractor wanted to reduce column from 22" to 12". 9/23/2002 1:37:57 PM
|
MEC02-02670
| Pressure Test | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | PASS |
|
|
|
BLD02-01852
| BLD-Foundation | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | PART |
|
|
JED--GATE CODE IS *3568; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Remainer of foundation wall-rebar in place--hd's not installed at time of inspection. 9/23/2002 5:59:51 PM
|
BLD02-01284
| BLD-Final | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung C/N posted 9/23/2002 2:06:14 PM
|
BLD02-01424
| BLD-Final | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung C/N posted 9/23/2002 2:24:06 PM
|
BLD02-02021
| BLD-Foundation | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | PART |
|
|
WES; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie wip--Footing inspection was not done because of scheduling problem on friday--setbacks and footings appear ok-- 9/23/2002 3:22:04 PM
|
BLD02-01732
| BLD-Framing/Rough-in | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/23/2002 at 11:22:12. Contact: ###-####. Ok to insulate 9/23/2002 3:52:20 PM
|
BLD02-01919
| BLD-Framing/Rough-in | 9/20/2002 | 9/23/2002 | 9/21/2002 12:00:00 AM | A | CANC |
|
|
SHEAR JOSH; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Disp set to [CANC] by a contractor via Hello! on 09/21/2002 at 14:21:30.
|