PLM02-02912
| Sprinkler (Final) | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM02-02670
| Final | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/23/2002 at 08:34:40. Contact: .
|
PLM02-02834
| Plumbing Rough-in | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/23/2002 at 10:42:08. Contact: ###-####. shower trap on second floor not true to its seal. structural conditions. allow running trap in shower drain. 9/22/2002 11:59:59 PM
|
PLM02-02917
| Sprinkler (Final) | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | PASS |
|
|
BILL- ###-####
|
PLM02-02918
| Sprinkler (Final) | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | PASS |
|
|
CHAD ###-####
|
PLM02-02504
| Final | 9/23/2002 | 9/23/2002 | 9/23/2002 12:00:00 AM | P | PASS |
|
|
|