ELE05-03300
| Final | 9/23/2005 | 9/23/2005 | 9/23/2005 4:41:32 PM | P | PASS |
|
|
SERVICE ON POLE Internet Inspection Request from: Andy Rose ok to final
|
ELE05-02210
| Final | 9/23/2005 | 9/23/2005 | 9/23/2005 4:40:51 PM | P | PASS |
|
|
call Chris to open thank-you; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH ok to final
|
ELE05-02328
| Final | 9/23/2005 | 9/23/2005 | 9/23/2005 3:19:09 PM | P | PASS |
|
|
carl; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to final
|
ELE05-03277
| Electrical Rough-In | 9/23/2005 | 9/23/2005 | 9/23/2005 3:03:19 PM | P | NR |
|
|
stu Note: underground RI - late afternoon; Please call 1/2 hr Phone #: ###-#### Internet Inspection Request from: Cathy Chiles need to see later, still core drilling
|
ELE05-03459
| Rough-In Permanent Service | 9/23/2005 | 9/23/2005 | 9/23/2005 2:10:28 PM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Kathy Briggs called, left message, left corr notice, first corr notice not complete,314.17(C) nm cable shall be fastened within 8" of box, 312.5 abrasion protection shall be provided for conductors entering enclosures
|
ELE05-02353
| Final | 9/23/2005 | 9/23/2005 | 9/23/2005 1:09:13 PM | P | PASS |
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles corrections made, ok to final
|
ELE05-03298
| Rough-In Permanent Service | 9/22/2005 | 9/23/2005 | 9/23/2005 10:30:01 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 9/22/2005 at 4:29:26 PM. Contact: ###-####. corr made, ric ok, p/s u/g n ok
|
ELE05-03365
| Rough-In Permanent Service | 9/21/2005 | 9/23/2005 | 9/23/2005 10:12:20 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 9/21/2005 at 3:44:34 PM. Contact: ###-####. ric ok, p/s u/g n ok
|
ELE05-03277
| Conference | 9/23/2005 | 9/23/2005 | 9/23/2005 9:56:02 AM | A | DONE |
|
|
Scheduled by a contractor via Hello! on 9/23/2005 at 7:23:05 AM. Contact: ###-####. talked aabout depth of gear and clearance to compactor
|
ELE05-01630
| Electrical Rough-In | 9/22/2005 | 9/23/2005 | 9/23/2005 9:27:29 AM | A | PASS |
|
|
partial ceiling inspection; Phone #: ###-#### Internet Inspection Request from: Nikki Day baths clg and walls,south walls, clg north x ok to cover
|
ELE05-03446
| Electrical Rough-In | 9/22/2005 | 9/23/2005 | 9/23/2005 8:42:11 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 9/22/2005 at 4:28:47 PM. Contact: ###-####. ok to cover walls only, east wall to be removed in large room
|
ELE05-02224
| Electrical Rough-In | 9/22/2005 | 9/23/2005 | 9/23/2005 8:05:24 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 9/22/2005 at 4:11:27 PM. Contact: ###-####. sw part ok to cover, main dining area, but ok to cover as needed, will see again.
|