BLD07-01006
| FIRE-Final Inspection | 9/23/2008 | 9/23/2008 | 9/24/2008 4:15:27 PM | P | PASS |
|
|
Fire life safety finaled.
|
BLD08-01598
| FIRE-Final Inspection | 9/23/2008 | 9/23/2008 | 9/23/2008 4:24:34 PM | P | FAIL |
|
|
See correction notice on site for a list of items to be finished prior to final including repair one exit sign, remove the manual thumbturn at the main entry/exit door, provide approved hardware at the restroom door, remove the surface mounted deadbolt at the back exit.
|
FIR08-00239
| INSP-Sprinkler Rough-in/Hydro | 9/22/2008 | 9/23/2008 | 9/23/2008 4:19:45 PM | A | PART |
|
|
Inspection for C/N items on the 4th floor per notes 9/22 completed acceptable.
|
BLD07-01006
| FIRE-Alarm Testing | 9/22/2008 | 9/23/2008 | 9/23/2008 4:14:49 PM | A | PASS |
|
|
Verified corrections are complete, one exit sign battery to be repaired today as agreed.
|
BLD08-01832
| FIRE-Final Inspection | 9/23/2008 | 9/23/2008 | 9/23/2008 4:10:39 PM | P | FAIL |
|
|
Provide approved hardware at the conference room west exit door, manual thumbturns are not allowed, plans need to be available at next site visit. Fire extinguisher okayed.
|
FIR08-00630
| INSP-Final Inspection | 9/22/2008 | 9/23/2008 | 9/23/2008 4:07:05 PM | A | PASS |
|
|
Fire sprinkler rough-in and final inspections completed at the same time, permit finaled.
|
FIR08-00569
| INSP-Final Inspection | 9/22/2008 | 9/23/2008 | 9/23/2008 4:05:25 PM | A | PART |
|
|
Scope of fire sprinkler work is complete, final pending forward flow test and control valve tamper switch supervision including the backflow shutoff valves.
|
FIR08-00588
| INSP-Final Inspection | 9/19/2008 | 9/23/2008 | 9/23/2008 4:01:07 PM | A | PASS |
|
|
Fire sprinkler permit work passed final inspection.
|
FIR07-00827
| INSP-Sprinkler Rough-in | 9/22/2008 | 9/23/2008 | 9/23/2008 3:59:51 PM | A | PART |
|
|
Annotations on plan indicate locations okay for cover at the drop ceilings, noted one overspaced head at a patient room to be relocated.
|