Inspections for the day of: Wednesday, September 23, 2009.
Number of inspections: 6
Percentage of inspections complete: 83 %
Percentage of inspections not complete: 17 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00584 Site Preparation9/22/20099/22/2009   
BLD09-01216 BLD-Conference9/23/20099/23/20099/23/2009 4:46:32 PMPDONE
Kim Phone #: ###-####
Talked about framing issues.
BLD08-01439 BLD-Final9/23/20099/23/20099/23/2009 4:45:55 PMPDEFR
Left Mssg for Matt..........Need fire final......then bldg final.








BLD09-00323 BLD-Framing/Rough-in9/23/20099/23/20099/23/2009 4:39:08 PMPFAIL
travis - shear Phone #: ###-####
C/N.....Exterior shear nailing.......Re-nail at 6" and 12"... all nails that are overdriven. Need special inspection of all epoxy installed retrofit hold downs. Provide copy of inspections for Structural inspector.
ESC09-00401 Site Preparation9/23/20099/23/20099/23/2009 2:06:40 PMAPASS
BLD09-01386 BLD-Foundation9/22/20099/23/20099/23/2009 2:05:00 PMAPASS
ian - wall Phone #: ###-####