ESC09-00584
| Site Preparation | 9/22/2009 | 9/22/2009 | | | |
|
|
|
BLD09-01216
| BLD-Conference | 9/23/2009 | 9/23/2009 | 9/23/2009 4:46:32 PM | P | DONE |
|
|
Kim Phone #: ###-#### Talked about framing issues.
|
BLD08-01439
| BLD-Final | 9/23/2009 | 9/23/2009 | 9/23/2009 4:45:55 PM | P | DEFR |
|
|
Left Mssg for Matt..........Need fire final......then bldg final.
|
BLD09-00323
| BLD-Framing/Rough-in | 9/23/2009 | 9/23/2009 | 9/23/2009 4:39:08 PM | P | FAIL |
|
|
travis - shear Phone #: ###-#### C/N.....Exterior shear nailing.......Re-nail at 6" and 12"... all nails that are overdriven. Need special inspection of all epoxy installed retrofit hold downs. Provide copy of inspections for Structural inspector.
|
ESC09-00401
| Site Preparation | 9/23/2009 | 9/23/2009 | 9/23/2009 2:06:40 PM | A | PASS |
|
|
|
BLD09-01386
| BLD-Foundation | 9/22/2009 | 9/23/2009 | 9/23/2009 2:05:00 PM | A | PASS |
|
|
ian - wall Phone #: ###-####
|