BLD13-01927
| FIRE-Final Inspection | 9/23/2013 | 9/23/2013 | 9/23/2013 3:38:44 PM | P | PASS |
|
|
Fire life safety finaled.
|
FIR12-00639
| INSP-Sprinkler Rough-in/Hydro | 9/20/2013 | 9/23/2013 | 9/23/2013 3:32:48 PM | A | NR |
|
|
Rough-in inspection at second floor incomplete due to changes in floorplan, main and branchline routing. Tie-ins at the east stairway unfinished. Need to provide stamped resubmittals reflecting actual pipe routing and accurate floorplan prior to approval for cover.
|
FIR13-00492
| INSP-Final Inspection | 9/20/2013 | 9/23/2013 | 9/23/2013 11:51:58 AM | A | PASS |
|
|
Fire alarm permit final approved.
|
FIR13-00308
| INSP-Sprinkler Rough-in | 9/20/2013 | 9/23/2013 | 9/23/2013 11:50:55 AM | A | PART |
|
|
Overhead work at the first floor mens and womens restrooms and adjacent corridor soffit, and second floor RR's and mechanical room are okay for sheetrock ceiling cover. Discussed project schedule, hydrostatic testing, and plan modifications due to field changes.
|
BLD13-02286
| FIRE-Conference | 9/23/2013 | 9/23/2013 | | P | |
|
|
Matt phone #: ###-####
|