Inspections for the day of: Monday, September 23, 2013.
Number of inspections: 21
Percentage of inspections complete: 90 %
Percentage of inspections not complete: 10 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-01011 General Inspection9/20/20139/20/2013   
ESC12-01155 General Inspection9/20/20139/20/2013   
BLD13-00484 BLD-Framing/Rough-in9/23/20139/23/20139/24/2013 7:05:18 AMPPART
Late afternoon - Robert Phone #: ###-#### shear ok to cover ext walls.
BLD13-01215 BLD-Framing/Rough-in9/23/20139/23/20139/23/2013 3:24:15 PMPPASS
larry Phone #: ###-####
BLD13-02117 BLD-Foundation9/23/20139/23/20139/23/2013 3:23:45 PMPPASS
Mana Phone #: ###-####
BLD13-00723 BLD-Energy code compliance9/23/20139/23/20139/23/2013 3:20:34 PMPPASS
BLD13-00723 BLD-Framing/Rough-in9/23/20139/23/20139/23/2013 3:20:15 PMPPASS
justin Phone #: ###-####
BLD13-01299 BLD-Final9/20/20139/23/20139/23/2013 1:27:57 PMAFAIL
Rollo Phone #: ###-#### tempered glass master shower
BLD13-02404 BLD-Final9/23/20139/23/20139/23/2013 1:27:11 PMPPASS
demo final // Andrea Phone #: ###-####
BLD13-02404 DOC - Permit Finaled9/23/20139/23/20139/23/2013 1:26:57 PMPPASS
BLD13-02403 BLD-Final9/23/20139/23/20139/23/2013 1:26:38 PMPPASS
demo final // Andrea Phone #: ###-####
BLD13-02403 DOC - Permit Finaled9/23/20139/23/20139/23/2013 1:26:24 PMPPASS
BLD13-02302 BLD-Final9/23/20139/23/20139/23/2013 1:19:44 PMPPASS
Jay Phone #: ###-####
BLD13-01754 BLD-Wall Bracing9/23/20139/23/20139/23/2013 11:38:44 AMPPART
joey Phone #: ###-#### second level ok to cover
BLD13-02195 BLD-Footing9/23/20139/23/20139/23/2013 11:38:05 AMPPASS
doug Phone #: ###-####
ESC13-00488 Site Final9/23/20139/23/20139/23/2013 11:35:21 AMAPASS
ESC13-00488 DOC - Permit Finaled9/23/20139/23/20139/23/2013 11:35:03 AMPPASS
BLD13-01153 BLD-Ceiling Grid Inspection9/23/20139/23/20139/23/2013 11:33:58 AMAPASS
in case of no answer try my desk phone ###-#### Phone #: ###-#### >> Inspection requested via web by Rock Self
BLD13-00756 BLD-Framing/Rough-in9/20/20139/23/20139/23/2013 10:19:28 AMAPART
Adam Phone #: ###-#### ok after other trades pass rough ins
BLD13-01782 BLD-Framing/Rough-in9/20/20139/23/20139/23/2013 10:18:36 AMAPART
Adam-inspection for the stairway between 16th & 17th floor Phone #: ###-####
BLD13-01709 BLD-Wall Bracing9/20/20139/23/20139/23/2013 10:17:54 AMAPART
josh Phone #: ###-#### second level ok to cover ext