ELE14-02616
| Rough-In Permanent Service | 9/23/2014 | 9/23/2014 | 9/23/2014 3:37:11 PM | P | PASS |
|
|
Please call before coming out I want to make sure I am going to be ready and please make it if you can one of your later stops of the afternoon. Thanks Jay Phone #: ###-#### Inspection requested via web by Jay Symondsh Rough in ok cover p/s u/g n ok
|
ELE14-01963
| Electrical Rough-In | 9/23/2014 | 9/23/2014 | 9/23/2014 2:22:02 PM | P | PASS |
|
|
Underground rough in for cover. Phone #: ###-#### Inspection requested via web by Rafael Castillo Electrical room 115 all underground in area as noted on contractor print rough in ok cover
|
ELE14-01288
| Final | 9/22/2014 | 9/23/2014 | 9/23/2014 1:36:12 PM | P | PASS |
|
|
Toby is the onsite contact Phone #: ###-#### Inspection requested via web by Buster Bowen Radiology phase 1&2 Final ok
|
ELE14-02604
| Electrical Rough-In | 9/22/2014 | 9/23/2014 | 9/23/2014 11:29:26 AM | P | CANC |
|
|
Inspection for trenches. After 3PM please. Phone #: ###-#### Inspection requested via web by Scott Kraemer Contractor called will reschedule
|
ELE12-03093
| Final | 9/23/2014 | 9/23/2014 | 9/23/2014 10:38:35 AM | P | PASS |
|
|
Final ok
|
ELE14-02377
| Final | 9/22/2014 | 9/23/2014 | 9/23/2014 10:29:59 AM | A | CANC |
|
|
Check for all temp wiring removal. ###-####; Phone #: ###-#### Not complete rescheduled
|
ELE14-00379
| Final | 9/22/2014 | 9/23/2014 | 9/23/2014 10:28:20 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by John VanZandt Final ok
|
ELE14-02233
| Electrical Rough-In | 9/22/2014 | 9/23/2014 | 9/23/2014 9:54:03 AM | A | PASS |
|
|
walls Phone #: ###-#### Inspection requested via web by Kevin Burke Contractor to remove 2 receptical outlets located 5' 10" from water edge to satisfy 680.22 other recepticals ok will check on final. Walls and hard lids rough in ok cover
|
ELE14-02619
| Conference | 9/19/2014 | 9/23/2014 | 9/23/2014 8:57:09 AM | A | DONE |
|
|
Please call for time to meet at project, thanks Phone #: ###-#### Inspection requested via web by Rick Beckman Discussed second service located on west side of fence feeding panel location north side by existing 3 phase service. NEC requires signage to be at each location discribing the other service location.
|
ELE14-02619
| Final | 9/23/2014 | 9/23/2014 | 9/23/2014 8:56:52 AM | P | PASS |
|
|
Please call for time to meet at project, thanks Phone #: ###-#### Inspection requested via web by Rick Beckman Permit for conference only . Final ok
|