GCE14-00152
| GCE-Rough-In | 9/18/2014 | 9/18/2014 | | P | |
|
|
HP ###-#### underground
|
ELE12-02633
| ELE-Aging Inspection | 9/23/2014 | 9/23/2014 | 9/24/2014 7:44:07 AM | | DONE |
|
|
too busy
|
ELE12-02642
| ELE-Aging Inspection | 9/23/2014 | 9/23/2014 | 9/24/2014 7:43:43 AM | | DONE |
|
|
too busy
|
ELE12-01889
| ELE-Aging Inspection | 9/23/2014 | 9/23/2014 | 9/24/2014 7:43:18 AM | | DONE |
|
|
too busy
|
ELE14-02590
| Final | 9/22/2014 | 9/23/2014 | 9/23/2014 2:29:59 PM | P | PASS |
|
|
10 solar panels. AC micro-inverter system. No DC voltage. A single home run, in conduit, is ran from solar array to the knife switch, located next to meter base in the back yard. From knife switch to breaker in main panel, at the bottom of busing, opposite the feeder lugs. This is an old split buss panel - so with the dead front on, the breaker appears to be in middle of panel, but is in fact at the end. The solar breaker is clearly marked, and its circuit number identified both in the knife switch and the panel schedule. The inverters, panels and rails are all bonded with a number 6 ground that runs back to the service ground in main panel.
Thanks guys Phone #: ###-#### Inspection requested via web by Ryan King final ok
|
GCE14-00158
| GCE-Temporary Service | 9/23/2014 | 9/23/2014 | 9/23/2014 1:25:39 PM | P | PASS |
|
|
Terry ###-#### t/s u/g n ok
|
ELE14-02500
| Final | 9/23/2014 | 9/23/2014 | 9/23/2014 12:54:07 PM | P | PASS |
|
|
Please call ahead to meet - Dave Phone #: ###-#### final ok corrections made
|
ELE14-00157
| Electrical Rough-In | 9/23/2014 | 9/23/2014 | 9/23/2014 12:35:51 PM | P | PASS |
|
|
pole base Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok pole bases
|
ELE14-01182
| Electrical Rough-In | 9/22/2014 | 9/23/2014 | 9/23/2014 12:02:44 PM | P | PASS |
|
|
3rd floor rough in cover. Shane is the contact ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates 3rd floor CH2 lobby ceiling ok
|
ELE14-01597
| Electrical Rough-In | 9/22/2014 | 9/23/2014 | 9/23/2014 11:04:07 AM | A | PASS |
|
|
Hard lid cover. Shane is the contact his cell is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates r/i exterior soffit can lights and all interior hardlids ok to cover
|
ELE14-01915
| Final | 9/22/2014 | 9/23/2014 | 9/23/2014 10:32:35 AM | A | PASS |
|
|
Please call Jim 30-45 min ahead.###-####. He will let you into the house. Phone #: ###-#### Inspection requested via web by William Andrews final ok
|
ELE14-01956
| Electrical Rough-In | 9/22/2014 | 9/23/2014 | 9/23/2014 10:16:57 AM | A | PASS |
|
|
Bath floor heat insp Phone #: ###-#### Inspection requested via web by John VanZandt r/i floor heat ok
|
ELE14-02252
| Final | 9/23/2014 | 9/23/2014 | 9/23/2014 9:43:56 AM | A | PASS |
|
|
Key in front outlet Phone #: ###-#### Inspection requested via web by TOM BICANDI final ok
|
ELE14-01182
| Final | 9/22/2014 | 9/23/2014 | 9/22/2014 10:29:09 AM | P | CANC |
|
|
3rd Floor rough in cover. Shane is the contact ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
ELE14-01182
| Final | 9/22/2014 | 9/23/2014 | 9/22/2014 10:23:31 AM | P | CANC |
|
|
3rd floor rough in cover. Shane is the contact his cell no. ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|