Inspections for the day of: Tuesday, September 23, 2014.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-00414 FIRE-Final Inspection9/23/20149/23/20149/23/2014 4:32:01 PMPPASS
Fire life safety final approved.
FIR14-00562 INSP-Final Inspection9/23/20149/23/20149/23/2014 4:10:56 PMPPASS
Scope of permit work completed. Fire sprinkler permit finaled.
BLD13-00938 FIRE-Final Inspection9/23/20149/23/20149/23/2014 1:56:23 PMPPASS
Fire life safety finaled.
FIR13-00689 INSP-Final Inspection9/23/20149/23/20149/23/2014 1:53:55 PMPPASS
Fire sprinkler permit finaled.
FIR13-00608 INSP-Final Inspection9/23/20149/23/20149/23/2014 1:53:21 PMPPASS
Fire sprinkler permit finaled.
FIR14-00562 INSP-Final Inspection9/19/20149/23/20149/23/2014 1:52:55 PMAPASS
Scope of work completed includes disconnect of supply lines to the demo portions and reconnect of new main and branchlines at areas to remain in service. Walkthrough passed with note to provide protection at OH doors in conjunction with inspection for new west wall construction.
FIR14-00455 INSP-Final Inspection9/22/20149/23/20149/23/2014 1:46:09 PMAPASS
Scope of work completed. Fire sprinkler permit finaled.
FIR13-00579 INSP-Final Inspection9/22/20149/23/20149/23/2014 1:45:24 PMAPASS
Fire sprinkler permit finaled.
FIR13-00440 INSP-Final Inspection9/22/20149/23/20149/23/2014 1:44:58 PMAPASS
Fire sprinkler permit finaled.
BLD14-02496 FIRE-Final Inspection9/22/20149/23/20149/23/2014 12:16:35 PMAFAIL
Correction items include notes #2 and 4 on the general list of requirements. Need to post signage at each tenant access to the shared restrooms per details indicated in the project scope description.