BLD14-00414
| FIRE-Final Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 4:32:01 PM | P | PASS |
|
|
Fire life safety final approved.
|
FIR14-00562
| INSP-Final Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 4:10:56 PM | P | PASS |
|
|
Scope of permit work completed. Fire sprinkler permit finaled.
|
BLD13-00938
| FIRE-Final Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 1:56:23 PM | P | PASS |
|
|
Fire life safety finaled.
|
FIR13-00689
| INSP-Final Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 1:53:55 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR13-00608
| INSP-Final Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 1:53:21 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR14-00562
| INSP-Final Inspection | 9/19/2014 | 9/23/2014 | 9/23/2014 1:52:55 PM | A | PASS |
|
|
Scope of work completed includes disconnect of supply lines to the demo portions and reconnect of new main and branchlines at areas to remain in service. Walkthrough passed with note to provide protection at OH doors in conjunction with inspection for new west wall construction.
|
FIR14-00455
| INSP-Final Inspection | 9/22/2014 | 9/23/2014 | 9/23/2014 1:46:09 PM | A | PASS |
|
|
Scope of work completed. Fire sprinkler permit finaled.
|
FIR13-00579
| INSP-Final Inspection | 9/22/2014 | 9/23/2014 | 9/23/2014 1:45:24 PM | A | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR13-00440
| INSP-Final Inspection | 9/22/2014 | 9/23/2014 | 9/23/2014 1:44:58 PM | A | PASS |
|
|
Fire sprinkler permit finaled.
|
BLD14-02496
| FIRE-Final Inspection | 9/22/2014 | 9/23/2014 | 9/23/2014 12:16:35 PM | A | FAIL |
|
|
Correction items include notes #2 and 4 on the general list of requirements. Need to post signage at each tenant access to the shared restrooms per details indicated in the project scope description.
|