BLD14-02146
| BLD-Final | 9/19/2014 | 9/19/2014 | | P | |
|
|
Rick Phone #: ###-####
|
BLD14-01775
| BLD-Final | 9/23/2014 | 9/23/2014 | 9/23/2014 3:59:17 PM | P | PASS |
|
|
Rod Phone #: ###-####
|
BLD14-01775
| DOC - Permit Finaled | 9/23/2014 | 9/23/2014 | 9/23/2014 3:59:07 PM | P | PASS |
|
|
|
GCB14-00088
| GCB-Shearwall | 9/22/2014 | 9/23/2014 | 9/23/2014 3:17:52 PM | P | FAIL |
|
|
John Wyman ###-####. Missing blocking, fasterners overspaced and incorrect fasteners used at some locations.
|
GCB14-00076
| GCB-Footing | 9/22/2014 | 9/23/2014 | 9/23/2014 2:35:07 PM | P | DEFR |
|
|
Anton ###-####. Contractor did not have approved plans on site. Noted to concrete subcontractor, that if he decides to place concrete, he is proceeding at his own risk. Approved plans must be on site for stemwall inspection.
|
BLD14-02748
| BLD-Conference | 9/23/2014 | 9/23/2014 | 9/23/2014 2:00:49 PM | P | DONE |
|
|
garage is done Phone #: ###-#### Inspection requested via web by Sandra Daffer
|
BLD14-02748
| DOC - Permit Finaled | 9/23/2014 | 9/23/2014 | 9/23/2014 2:00:39 PM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
BLD14-02146
| BLD-Final | 9/23/2014 | 9/23/2014 | 9/23/2014 1:29:40 PM | P | CANC |
|
|
Brandon Phone #: ###-####
|
BLD14-00948
| BLD-Other | 9/22/2014 | 9/23/2014 | 9/23/2014 1:29:28 PM | P | CANC |
|
|
Mike// seepage bed Phone #: ###-####
|
BLD14-01591
| BLD-Footing | 9/22/2014 | 9/23/2014 | 9/23/2014 1:29:10 PM | P | PASS |
|
|
John Phone #: ###-####
|
BLD14-01849
| BLD-Final | 9/19/2014 | 9/23/2014 | 9/23/2014 11:46:37 AM | A | FAIL |
|
|
Colby Phone #: ###-####. Provide the 3rd party airseal inspection report or the blower door test result and post. Complete the required info for required energy cert. correction notice posted
|
BLD14-01924
| BLD-Final | 9/19/2014 | 9/23/2014 | 9/23/2014 11:46:22 AM | A | FAIL |
|
|
Colby Phone #: ###-####. Provide the 3rd party airseal inspection report or the blower door test result and post. Complete the required info for required energy cert. correction notice posted.
|
BLD14-00251
| BLD-Ceiling Grid Inspection | 9/22/2014 | 9/23/2014 | 9/23/2014 10:41:16 AM | A | PASS |
|
|
Phase II ceiling grid inspection Phone #: ###-#### Inspection requested via web by Chris Jackson
|
BLD14-01798
| BLD-Framing/Rough-in | 9/22/2014 | 9/23/2014 | 9/23/2014 10:12:10 AM | A | PASS |
|
|
Rocco Phone #: ###-####. interior steel stud walls, no grid.
|
BLD14-00214
| BLD-Wall Bracing | 9/22/2014 | 9/23/2014 | 9/23/2014 9:25:42 AM | A | PASS |
|
|
Richard Phone #: ###-####. Floor to floor straps ok.
|
BLD14-02146
| BLD-Final | 9/22/2014 | 9/23/2014 | 9/23/2014 9:04:48 AM | A | PASS |
|
|
Rick Phone #: ###-####
|
BLD14-02146
| DOC - Permit Finaled | 9/23/2014 | 9/23/2014 | 9/23/2014 9:04:33 AM | P | PASS |
|
|
|