ESC13-01294
| Aging Inspection | 9/23/2014 | 9/23/2014 | 9/25/2014 2:32:14 PM | | PASS |
|
|
Pine Village townhome complete. ESC conditions satisfied.
|
ESC13-01295
| Aging Inspection | 9/23/2014 | 9/23/2014 | 9/25/2014 2:31:43 PM | | PASS |
|
|
Pine Village townhome complete. ESC conditions satisfied.
|
ESC13-01293
| Aging Inspection | 9/23/2014 | 9/23/2014 | 9/25/2014 2:27:20 PM | | PASS |
|
|
Pine Village townhome. WIP. Shoup Street was swept as requested, and trash service removed many discarded materials. No new corrections, jst continue daily housekeeping. All stormdrain inlets in area of activity are protected.
|
ESC12-00403
| General Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 2:52:01 PM | | PART |
|
|
Streets surrounding JUMP are free of trackout or excessive sediment accumulations. Observed dewatering discharge outlet and Strata engineers was there taking their daily sampling for turbidity. Measurements have been in compliance and water looked clear.
2 deficiencies: 1. Visible areas where concrete has been washed out in uncontained area (close to ground water) 2. No rock on east construction ramp. Will become a problem in rainy season.
Will send notice to Hoffman stormwater crew.
|
ESC14-00347
| General Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 2:23:12 PM | | PASS |
|
|
Some staging in the parking lot but no earth work, loose sediment, or disharges/spills observed. No violations.
|
ESC14-00326
| General Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 2:11:03 PM | | PASS |
|
|
Pool house near completion, BLD permit is still open and some minor work ongoing. Pool permit has already been finaled. The berm at bottom of propertly has been landscaped/stabilized, containing any loose dirt further up slope. No ESC violations observed.
|
ESC14-00310
| General Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 1:46:36 PM | | PASS |
|
|
Permit posted and site has a gator gaurd wattle around the site to contain sediment. Some minor trackout associated with work by framing crew, but can be swept at end of day.
Approved.
|
ESC14-00328
| General Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 1:30:27 PM | | PASS |
|
|
No activity at Willow Lane wetlands project. Topsoil stockpiles are in position as indicated on ESC plan and are surrounded by fiber wattles for perimeter control and tops have been graded flat.
Some areas around the edge of the wetland basin area have been scraped/grubbed to remove old topsoil. Fiber wattle is installed at west end (outlet end) of wetland. Currently no water in the wetland. No corrections needed at site.
|
ESC13-00466
| Aging Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 12:31:38 PM | | PASS |
|
|
All permits finaled. Orchards senior living unit complete. Open areas are landscaped and stabilized.
|
ESC13-00466
| DOC - Permit Finaled | 9/23/2014 | 9/23/2014 | 9/23/2014 12:26:53 PM | P | PASS |
|
|
|
ESC13-01057
| Aging Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 12:26:40 PM | | PASS |
|
|
Orchards unit complete. No outstanding violations. Open areas landscaped and stabilized.
|
ESC13-01057
| DOC - Permit Finaled | 9/23/2014 | 9/23/2014 | 9/23/2014 12:25:49 PM | P | PASS |
|
|
|
ESC13-01182
| General Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 12:14:23 PM | | PASS |
|
|
WIP. No trackout or dust observed. Industrial site with no MS4 drainage or surface water. No corrections required at this time. Warehouse frame is up and entry road has been paved.
|
ESC14-00916
| Site Preparation | 9/23/2014 | 9/23/2014 | 9/23/2014 11:39:19 AM | P | PASS |
|
|
John Phone #: ###-####
Homeowner RP lives onsite. Small garage, sheet flow in construction area does not go off site due to raised alleyway.
Low risk site and relatively small project. Permit posted in alley. Discussed ESC conditions. Approved for construction.
|
ESC14-00299
| BMP Violation | 9/22/2014 | 9/23/2014 | 9/23/2014 11:02:11 AM | A | PASS |
|
|
Follow up inspection requested by Josh Baker with Westminster Homes to see that corrections are complete/adequate
9:00 AM # ###-####
Corrections completed: 1. Silt fence BMP has been installed for downslope containment while retaining wall is being constructed. 2. DI filter bag placed on storm drain in front of site. 3. Permit posted with contact information.
Approved to continue construction. Discussed ESC conditions with RP/GC and requirements going forward.
|
ESC14-00289
| General Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 10:23:01 AM | | PART |
|
|
Permit posted and very little trackout. Site is surrounded by the natural vegetation which been preseved.
Stucco crew did not use a lined washout and has washed out in numerous places with some flow off the bottom end of site. The slurry is now dry, but I requested clean up and provision of more washout if necessary and will discuss BMPs for future projects.
|
ESC14-00284
| General Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 10:14:12 AM | | PART |
|
|
Some sediment at low end of site is migrating to sidewalk and gutter. The DI is protected with capacity but should have a wattle or stabilization. Some trash clean up is needed around the container and the contractor doing the wall washed out a small amount on the lot so will need to clean up. No discharges leaving site - mainly housekeeping.
|
ESC13-00684
| General Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 10:00:50 AM | | PASS |
|
|
No construction activity at Antelope Springs at time of inspection.
Perimeter barrier and fencing is good containment for site. All DI's on Parsnip Peak have filter bag protection and streets and mostly free of sediment. Some minor accumulation of sand in gutters.
The irrgation canal has been routed through the central common area. Water flowing through looked clean and the channel has been lined with rock
No current issues but will inquire with owner about further stabilization or installation of a sediment containment BMP on the north side of the "stream". Water exiting site through culvert is not turbid or have other characteristics of pollution.
SWPPP is managed by Lurre and Kris Jensen.
|
ESC14-00670
| Site Preparation | 9/23/2014 | 9/23/2014 | 9/23/2014 9:38:23 AM | P | PASS |
|
|
ESC site prep for rough grading phase has been conducted with Jeremy from Bruno Built. BLD permit in process of final review; ESC site map and plan were approved. Bruno Built has good ESC track record.
BMPs include timing of construction, preservation of buffer vegetation below homesite (downslope), lined concrete washout, and check dams once side drainage channels have been installed.
Approved to begin grubbing & rough grading. No vertical construction or concrete work has been approved.
|
ESC14-00878
| Site Preparation | 9/22/2014 | 9/23/2014 | 9/23/2014 9:31:00 AM | A | PASS |
|
|
Jeff Phone #: ###-####
Runway realignment project by Central Paving. Site is within restricted zone. Discussed ESC conditions and BMPs for site with Jeff. He stated inlets are in place, water supression for dust, and control trackout as necessary. Flat area, no surface water.
ESC fees paid. Approved.
|
ESC13-00970
| Site Final | 9/19/2014 | 9/23/2014 | 9/22/2014 1:40:52 PM | A | CANC |
|
|
Tianna Park site final. Check if fees have been paid to final.
Re-inspection moved to Wednesday morning 9/24
|