Inspections for the day of: Wednesday, September 23, 2015.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00931 Site Preparation9/23/20159/23/20159/23/2015 4:45:24 PMPCANC
ESC15-00368 General Inspection9/23/20159/23/20159/23/2015 3:47:44 PM PASS
Frame and footprint of foothills home is complete and all utilities, including roof top stormwater stub is complete so there should be no more significant earthwork. No sediment leaving site, and work has stayed within clearing limits to preserve native vegetation and rock formations. No corrections, WIP
ESC14-00608 General Inspection9/23/20159/23/20159/23/2015 3:29:26 PM PASS
ESC15-00764 Random Inspection9/23/20159/23/20159/23/2015 3:07:56 PMPFAIL
Need to sweep up excess dirt and sediment in gutter and street. Collect garbage and put in trash bin. No serious violations, but looks like no housekeeping conducted recently.
ESC15-00332 Aging Inspection9/23/20159/23/20159/23/2015 3:06:34 PM PASS
Home complete and occupied. ESC permit finaled, home is surrounded by two active projects ESC15-00931 & ESC15-00764. See both for corrections in Tianna Park for Sunrise Homes. This permit finaled.
ESC15-00332 DOC - Permit Finaled9/23/20159/23/20159/23/2015 2:59:49 PMPPASS
ESC15-00348 DOC - Permit Finaled9/23/20159/23/20159/23/2015 2:39:03 PMPPASS
ESC15-00348 General Inspection9/23/20159/23/20159/23/2015 2:38:57 PM PASS
Work complete. No disturbed area or materials on site.
ESC15-00025 Site Final9/23/20159/23/20159/23/2015 2:34:11 PMPPASS
Work complete, site cleaned up of building materials and loose sediment. Disturbed areas stabilized. Permit finaled.
ESC15-00357 General Inspection9/23/20159/23/20159/23/2015 2:13:10 PM PASS
Construction of cell tower is complete. No ESC issues at site. Permit finaled.
ESC15-00357 DOC - Permit Finaled9/23/20159/23/20159/23/2015 2:12:17 PMPPASS
ESC15-00358 General Inspection9/23/20159/23/20159/23/2015 12:02:19 PM PASS
WIP on mansion grounds and interior work. Site is keeping pretty clean, no complaints have been received. No significant trackout from site to Houston Road. Loose sediment in front of project should be swept as well as the trash should be serviced by end of the week. No violations, just general housekeeping is needed.
ESC15-00407 Aging Inspection9/23/20159/23/20159/23/2015 11:48:02 AM PART
Home construction complete, no further earth work. Yard is landscaped/stabilized.

Correction needed to final permit:

- remove sand bag used for sediment control, sweep up loose sand and sediment in the gutter.

Called RP-homeowner Kyle and left VM. Will wait for response to re-inspect.
ESC15-01225 Site Preparation9/22/20159/23/20159/23/2015 11:26:55 AMAPASS
Ryan Phone #: ###-####

Site BMPs installed. Existing yard next to hillside slope will not be disturbed. Access to backyard will be off Windsong. Concrete washout container and DI bag for Windsong storm drain provided.
ESC15-01191 Site Preparation9/22/20159/23/20159/23/2015 10:47:25 AMAPASS
requested for 10 AM. Homeowner RP Paul Krumm ###-####

Site prep conducted with Homeowner RP. Permit sign to be posted on side fence. Work to include slab removal and foundation work. Washout will be discharged in his side gravel yard to infiltrate, I explained prohibition of mixing with stormwater. Other BMPs include housekeeping and asand bag placed in gutter to capture any loose sediment from work area.

Approved.