ELE16-01652
| Electrical Rough-In | 9/23/2016 | 9/23/2016 | 9/23/2016 1:42:39 PM | P | PASS |
|
|
Bonding of fountain cans. Contact John @ ###-#### about 30mins prior to inspection. Phone #: ###-#### Inspection requested via web by Kristopher Wilson Bonding as noted rough in ok cover
|
ELE16-02722
| Electrical Rough-In | 9/23/2016 | 9/23/2016 | 9/23/2016 12:39:11 PM | P | PASS |
|
|
Ceiling inspection! Call for access Phone #: ###-#### Inspection requested via web by steve sellers Grid rough in ok cover
|
ELE16-01838
| Final | 9/23/2016 | 9/23/2016 | 9/23/2016 11:55:39 AM | P | FAIL |
|
|
Branch Circuit Panels, Branch Circuits, Equip. Conn.,Outlets, Office Furniture All LV systems Phone #: ###-#### Inspection requested via web by Tom Betty 110.3- Connect furniture as per manufacturers instructions. Furniture fed by panel 41A circuits 63, 65 not working. 300.15- All boxes containing cables shall be covered. Some blinds back ordered wiring not in boxes operates at 15 volt DC. Tie up and store neatly for future installation. Secure covers on furniture several loose. 300.21- Seal large 4x4 hole on interior of electrical room. Seal floor and ceiling when temp wiring has been removed. 392.60- Ladder racks for data cabling shall be bonded. 605.5- Connections to some furniture not complete and furniture missing.
|
ELE15-01348
| Final | 9/23/2016 | 9/23/2016 | 9/23/2016 11:24:43 AM | A | FAIL |
|
|
Branch Circuit Panels, Branch Circuits, Equip. Conn. , Outlets, Level 4 Stack 1,2,3,4 Phone #: ###-#### Inspection requested via web by Tom Betty 110.3- Connect furniture as per manufacturers instructions. Furniture fed by panel 41A circuits 63, 65 not working. 300.15- All boxes containing cables shall be covered. Some blinds back ordered wiring not in boxes operates at 15 volt DC. Tie up and store neatly for future installation. Secure covers on furniture several loose. 300.21- Seal large 4x4 hole on interior of electrical room. Seal floor and ceiling when temp wiring has been removed. 392.60- Ladder racks for data cabling shall be bonded. 605.5- Connections to some furniture not complete and furniture missing.
|
ELE16-01838
| Final | 9/22/2016 | 9/23/2016 | 9/23/2016 11:10:28 AM | A | CANC |
|
|
Contact Brandon Robinson for level 4 TI lighting final. Phone #: ###-#### Inspection requested via web by Tom Betty Needed note of prewalk of level 4 stack 1, 2, 3, 4. See conference
|
ELE16-01838
| Conference | 9/23/2016 | 9/23/2016 | 9/23/2016 11:09:34 AM | P | DONE |
|
|
Contact Brandon Robinson for level 4 TI lighting final. Phone #: ###-#### Inspection requested via web by Tom Betty Level 4 stack 1, 2, 3,4 lighting complete
|
ELE16-00151
| Electrical Rough-In | 9/22/2016 | 9/23/2016 | 9/23/2016 9:35:12 AM | A | PASS |
|
|
Ceiling cover inspection VRT level. Contact Eric Gibson ###-####. If he does not answer contact Toby Groves ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves VRT grid complete rough in ok cover
|
ESC16-00756
| Site Preparation | 9/23/2016 | 9/23/2016 | 9/23/2016 8:49:50 AM | P | PASS |
|
|
Fully landscaped. Final ok
|
ELE16-02484
| Electrical Rough-In | 9/21/2016 | 9/23/2016 | 9/23/2016 8:44:17 AM | A | PASS |
|
|
Randy. Ceiling cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy Ceiling grid rough in ok cover
|