FIR16-00305
| INSP-Sprinkler Rough-in | 9/22/2016 | 9/23/2016 | 9/23/2016 10:51:35 AM | A | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping located on level 5 complete, overhead fire sprinkler piping located on level 5 approved for cover.
|
FIR16-00210
| INSP-Final Inspection | 9/23/2016 | 9/23/2016 | 9/23/2016 10:50:30 AM | P | PASS |
|
|
Final inspection for dry standpipes complete, knox caps are on order and will be installed when received.
|
FIR16-00017
| INSP-Final Inspection | 9/20/2016 | 9/23/2016 | 9/23/2016 10:47:14 AM | P | PASS |
|
|
Final fire sprinkler inspection passed/complete, hydrostatic test was completed on 06MAY2016
|
FIR16-00518
| INSP-Sprinkler Rough-in | 9/22/2016 | 9/23/2016 | 9/23/2016 9:27:45 AM | A | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping complete, overhead fire sprinkler piping approved for cover. Pendant head located in the dining area is less than 12 inches from heat source grid mounted heat register, sprinkler head will be changed from a 155 degree to a 200 degree.
|