MIS19-00311
| BLD-Conference | 9/20/2019 | 9/23/2019 | 9/24/2019 10:51:45 AM | A | DONE |
|
|
possible work without a permit Phone #: ###-####//went by location on 9/23 and 9/24 no work appears to be going on//this is a flooring and countertop warehouse//
|
BLD19-03105
| BLD-Framing/Rough-in | 9/23/2019 | 9/23/2019 | 9/23/2019 3:23:06 PM | P | NR |
|
|
Daniel Phone #: ###-####//needs electrical inspection//need to add studs at locations discussed//need to add shear blocks//call in for framing after electrical passes//
|
BLD19-02787
| BLD-Ceiling Grid Inspection | 9/23/2019 | 9/23/2019 | 9/23/2019 2:00:57 PM | P | PART |
|
|
Sid Phone #: ###-####//need to fire caulk penetrations at fire wall//ok to cover grid--leave grid out at firewall to check at final//
|
BLD19-02849
| BLD-Foundation | 9/20/2019 | 9/23/2019 | 9/23/2019 11:04:37 AM | A | PART |
|
|
Ryan-wall Phone #: ###-####//basement only//will need to call in for remainder of foundation//
|
BLD19-02888
| BLD-Foundation | 9/20/2019 | 9/23/2019 | 9/23/2019 10:28:48 AM | A | PASS |
|
|
Mud at 11 - Tiffany-stem wall Phone #: ###-####
|
BLD19-02384
| BLD-Wall Bracing | 9/20/2019 | 9/23/2019 | 9/23/2019 9:19:21 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//ok to wrap exterior//check blocking and portal frame straps at framing//will need to add holddown at front door where STHD14 is in wrong location//
|