Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-02235 BLD-Wall cover9/24/19999/24/19999/24/1999 12:00:00 AM FAIL
Scheduled by a contractor via Hello! on 09/24/1999 at 08:01:43. Contact: ###-####. C/N engineer to clarify front shear.
BLD98-02625 BLD-Concrete9/21/19999/24/19999/24/1999 12:00:00 AMAPART
###-####-- SLAB POUR- 2ND FLOOR Slab ok 2nd floor pending special insp. Report and appr.
BLD99-01358 BLD-Final9/22/19999/24/19999/24/1999 12:00:00 AMAPASS
-call ###-#### sun is the owner please call C/C #16240
BLD99-02616 BLD-Framing/Rough-in9/23/19999/24/19999/24/1999 12:00:00 AMAPART
BILL DAVIS ###-#### --SHEAR PANEL Ok to side
BLD99-02318 BLD-Energy code compliance9/23/19999/24/19999/24/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/23/1999 at 11:59:17. Contact: ###-####.
BLD99-01792 BLD-Energy code compliance9/23/19999/24/19999/24/1999 12:00:00 AMAPASS
EMMETT ###-####
BLD98-03667 BLD-Framing/Rough-in9/23/19999/24/19999/24/1999 12:00:00 AMAFAIL
ROGER CEILING ALSO ###-#### C/N ceiling grid seismic pods.
BLD99-02346 BLD-Framing/Rough-in9/23/19999/24/19999/24/1999 12:00:00 AMAPART
SHEAR WALL INSP-- TROY ###-#### Shear wall ok
BLD99-01817 BLD-Final9/24/19999/24/19999/24/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/24/1999 at 07:03:13. Contact: ###-####. L/C issued
BLD99-02505 BLD-Energy code compliance9/23/19999/24/19999/24/1999 12:00:00 AMPPASS
MIKE ###-####
BLD99-02855 BLD-Foundation9/24/19999/24/19999/24/1999 12:00:00 AMPFAIL
Eric ###-#### No plans on site (wall insp.)
BLD99-02857 BLD-Foundation9/24/19999/24/19999/24/1999 12:00:00 AMPFAIL
Eric ###-#### Found. Poured w/o inspection
BLD99-02491 BLD-Framing/Rough-in9/24/19999/24/19999/24/1999 12:00:00 AMPPART
shear wall insp- emmett ###-#### Shear wall ok (check c/n at frame)
BLD99-02561 BLD-Framing/Rough-in9/24/19999/24/19999/24/1999 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 09/24/1999 at 09:06:53. Contact: ###-####. C/N Bearing @ C-1 Truss, add stud (kitchen)..
BLD99-02587 BLD-Framing/Rough-in9/24/19999/24/19999/24/1999 12:00:00 AMPPASS
Per Jim Sly
BLD99-01535 BLD-Framing/Rough-in9/24/19999/24/19999/24/1999 12:00:00 AMPFAIL
Steve Kono ###-####--CANCEL-WILL RESCHEDULE
BLD99-02245 BLD-Energy code compliance9/24/19999/24/19999/24/1999 12:00:00 AMPPASS
###-#### wes did not do this can you do asap.