Inspections for the day of: Tuesday, September 24, 2002.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01822 BLD-Energy code compliance9/23/20029/24/20029/24/2002 12:00:00 AMAPASS
KYLE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD01-02750 BLD-Conference9/23/20029/24/20029/24/2002 12:00:00 AMAPASS
Carl, please contact them and encourage them to finish their project. Perm. occ. have been issued to the newest structures, however, work has not been completed on the older existing building (which is attached). If you need addl. info., talk to George. Thanks - Cathy...need fire final 340 9/24/2002 4:27:40 PM
BLD02-02022 BLD-Framing/Rough-in9/23/20029/24/20029/24/2002 12:00:00 AMAFAIL
LARRY; Phone #: ###-#### Internet Inspection Request from: Darla Downs; need calcs for joist/beam carrying ldder frame, complete fireblocks, complete thru studs for attic trusses at 2nd floor...recall. 9/24/2002 11:55:00 AM
BLD02-02022 BLD-Energy code compliance9/23/20029/24/20029/24/2002 12:00:00 AMAFAIL
LARRY; Phone #: ###-#### Internet Inspection Request from: Darla Downs; adjust insul for r30 & r 38 as req'd, ok to cover attic area only. 9/24/2002 11:55:49 AM
MEC02-02712 Rough-in9/23/20029/24/20029/24/2002 12:00:00 AMANR
R/I DOYLE ###-#### ...took for al h. 9/27/2002 9:10:55 AM
MEC02-02428 Final9/23/20029/24/20029/24/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 09/23/2002 at 08:34:37. Contact: ###-####. c/n, add'l post, no access underfloor 9/24/2002 10:19:09 AM
BLD01-01635 BLD-Final9/23/20029/24/20029/24/2002 12:00:00 AMPPASS
###-####
BLD02-00542 BLD-Conference9/23/20029/24/20029/24/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/23/2002 at 11:02:09. Contact: .w/ bldr re spec insp reqs....int ftgs for beam ok, need moment frame. 9/24/2002 4:28:39 PM
BLD02-01853 BLD-Final9/18/20029/24/20029/24/2002 12:00:00 AMPNR
verify p& z, fire, etc. 9/24/2002 6:01:50 PM
BLD02-01234 BLD-Conference9/20/20029/24/20029/24/2002 12:00:00 AMPPART
###-#### need to amend permit to show kitchen...add value...WIP, homeowner. 9/24/2002 5:07:10 PM
BLD02-01877 BLD-Framing/Rough-in9/24/20029/24/20029/24/2002 12:00:00 AMPCANC
for cover; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD02-02164 BLD-Framing/Rough-in9/24/20029/24/20029/24/2002 12:00:00 AMPFAIL
shear matt; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie, eng'r to advise...correction onsite. 9/24/2002 6:01:02 PM
BLD02-01822 BLD-Conference9/24/20029/24/20029/24/2002 12:00:00 AMPPASS
firestops ok, ok to cover. 9/24/2002 6:01:27 PM
BLD02-01883 BLD-Framing/Rough-in9/24/20029/24/20029/24/2002 12:00:00 AMPNR
keep correction, need all seismic wires; will check minor hvac w/ frame reinsp.