BLD02-01627
| BLD-Conference | 9/23/2002 | 9/24/2002 | 9/24/2002 12:00:00 AM | A | PART |
|
|
framing inspection; Phone #: ###-#### Internet Inspection Request from: KIM WINKLE Framing ok now but needs the prior c/n for insulation called contractor. 9/24/2002 10:34:28 AM
|
MEC02-02694
| Pressure Test | 9/23/2002 | 9/24/2002 | 9/24/2002 12:00:00 AM | A | PASS |
|
|
###-####- WILL
|
BLD02-01851
| BLD-Foundation | 9/23/2002 | 9/24/2002 | 9/24/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD02-01461
| BLD-Foundation | 9/23/2002 | 9/24/2002 | 9/24/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC02-02615
| Pressure Test | 9/23/2002 | 9/24/2002 | 9/24/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD02-01996
| BLD-Framing/Rough-in | 9/24/2002 | 9/24/2002 | 9/24/2002 12:00:00 AM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung. Ok need to provide a connection at bedroom west wall header contractor on site will provide this a insulation inspection also need to foem seal package. 9/24/2002 3:40:15 PM
|
MEC02-02250
| Final | 9/24/2002 | 9/24/2002 | 9/24/2002 12:00:00 AM | P | FAIL |
|
|
brandon; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Called contractor need to provide smokeevac means in all areas. 9/24/2002 3:38:43 PM
|
BLD02-01795
| BLD-Foundation | 9/24/2002 | 9/24/2002 | 9/24/2002 12:00:00 AM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung all footings have been poured ? This pour is for the stem wall and is approx 50% complete. 9/24/2002 3:41:32 PM
|
MEC02-02717
| Pressure Test | 9/24/2002 | 9/24/2002 | 9/24/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD02-01627
| BLD-Framing/Rough-in | 9/24/2002 | 9/24/2002 | 9/24/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/24/2002 at 11:15:57. Contact: ###-####.
|