Inspections for the day of: Tuesday, September 24, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01627 BLD-Conference9/23/20029/24/20029/24/2002 12:00:00 AMAPART
framing inspection; Phone #: ###-#### Internet Inspection Request from: KIM WINKLE Framing ok now but needs the prior c/n for insulation called contractor. 9/24/2002 10:34:28 AM
MEC02-02694 Pressure Test9/23/20029/24/20029/24/2002 12:00:00 AMAPASS
###-####- WILL
BLD02-01851 BLD-Foundation9/23/20029/24/20029/24/2002 12:00:00 AMAPASS
###-####
BLD02-01461 BLD-Foundation9/23/20029/24/20029/24/2002 12:00:00 AMAPASS
###-####
MEC02-02615 Pressure Test9/23/20029/24/20029/24/2002 12:00:00 AMAPASS
###-####
BLD02-01996 BLD-Framing/Rough-in9/24/20029/24/20029/24/2002 12:00:00 AMPPART
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung. Ok need to provide a connection at bedroom west wall header contractor on site will provide this a insulation inspection also need to foem seal package. 9/24/2002 3:40:15 PM
MEC02-02250 Final9/24/20029/24/20029/24/2002 12:00:00 AMPFAIL
brandon; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Called contractor need to provide smokeevac means in all areas. 9/24/2002 3:38:43 PM
BLD02-01795 BLD-Foundation9/24/20029/24/20029/24/2002 12:00:00 AMPPART
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung all footings have been poured ? This pour is for the stem wall and is approx 50% complete. 9/24/2002 3:41:32 PM
MEC02-02717 Pressure Test9/24/20029/24/20029/24/2002 12:00:00 AMPPASS
###-####
BLD02-01627 BLD-Framing/Rough-in9/24/20029/24/20029/24/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/24/2002 at 11:15:57. Contact: ###-####.