FIR02-00039
| INSP-Final Inspection | 9/24/2002 | 9/24/2002 | 9/24/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/24/2002 at 10:45:28. Contact: ###-####. tested tampers/flows okay; need chain/lock on PIV; splash gaurd at inspectors test as shown on plans 9/24/2002 3:13:11 PM
|
FIR02-00070
| INSP-Final Inspection | 9/24/2002 | 9/24/2002 | 9/24/2002 12:00:00 AM | P | FAIL |
|
|
tested detectors for AHU shutsown - larger units have 30 second delay; need to trim back flange on weatherproof covers so the detector cover can be removed; need NFPA record of completion 9/24/2002 3:21:50 PM
|