ELE03-00245
| ELE-Aging Inspection | 9/24/2003 | 9/24/2003 | 9/24/2003 12:00:00 AM | | NH |
|
|
called no access contractor will call for inspection with combonation too lock so I can inspect 9/30/2003 1:48:33 PM
|
ELE03-02647
| Rough-In Permanent Service | 9/22/2003 | 9/24/2003 | 9/24/2003 12:00:00 AM | A | PASS |
|
|
We completed the additional work you had requested.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok 9/24/2003 8:00:43 AM
|
ELE03-01018
| Electrical Rough-In | 9/22/2003 | 9/24/2003 | 9/24/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 9/22/2003 at 7:54:26 PM. Contact: ###-####. cor. posted met owner,, 314.16 box fill, 314.17 needs conn at metal boxes, 250.148 grd metal boxes 404.12 pigtails for switches, 110.12(A) replastic boxes unused KOs210.52(A) spacing, 210.11(C)(3) needs bath circuit, 300.4 (A)(1)&(D) 9/24/2003 9:56:10 AM
|
ELE03-01537
| Final | 9/23/2003 | 9/24/2003 | 9/24/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 9/23/2003 at 2:25:27 PM. Contact: ###-####. ok card signed 9/24/2003 12:06:15 PM
|
ELE03-02847
| Electrical Rough-In | 9/24/2003 | 9/24/2003 | 9/24/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 9/24/2003 at 8:04:26 AM. Contact: ###-#### called left message could not locate area they want r/i 9/24/2003 4:18:33 PM
|
ELE03-02975
| Conference | 9/24/2003 | 9/24/2003 | 9/24/2003 12:00:00 AM | P | PART |
|
|
john ###-#### -call 1st before insp conf ok 9/24/2003 1:09:31 PM
|
ELE03-02351
| Permanent Service | 9/24/2003 | 9/24/2003 | 9/24/2003 12:00:00 AM | P | PASS |
|
|
harry; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
p/s o/h new ok 9/24/2003 4:11:58 PM
|
ELE03-02372
| Electrical Rough-In | 9/24/2003 | 9/24/2003 | 9/24/2003 12:00:00 AM | P | PART |
|
|
jerad; Phone #: ###-#### Internet Inspection Request from: Barbara Moore basement u/g ok 9/24/2003 3:13:57 PM
|