ESC03-00338
| Tracking Control | 9/22/2003 | 9/24/2003 | 9/24/2003 12:00:00 AM | A | PASS |
|
|
|
ESC03-00369
| BMP Violation | 9/23/2003 | 9/24/2003 | 9/24/2003 12:00:00 AM | A | PASS |
|
|
Clearwater--Jared Ramey RP--###-#### 9/24/2003 8:19:24 AM
|
BLD03-00279
| BLD-Final | 9/23/2003 | 9/24/2003 | 9/24/2003 12:00:00 AM | A | CANC |
|
|
Meet contractor at 8:30 a.m
|
BLD03-00279
| BLD-Final | 9/24/2003 | 9/24/2003 | 9/24/2003 12:00:00 AM | A | PART |
|
|
Structure is ok--No occupancy card which is needed to verify ACHD and Zoning finals per required signatures per permit. 9/24/2003 8:45:43 AM
|