Inspections for the day of: Friday, September 24, 2004.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Kinnear
TitleELE-INSPECTOR
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE04-02355 Final9/23/20049/24/20049/24/2004 12:00:00 AMAPASS
allen; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok final 9/24/2004 9:57:25 AM
ELE04-01553 Final9/23/20049/24/20049/24/2004 12:00:00 AMAFAIL
call ###-#### to let Dave Green know if there are any questions regarding this final needed to have idaho power hookup this application.; Phone #: ###-#### Internet Inspection Request from: chris green no power to building -- needs to pot hole for underground conduit t/w contractor 9/24/2004 9:22:25 AM
ELE04-02402 Final9/23/20049/24/20049/24/2004 12:00:00 AMAPASS
duane; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok final 9/24/2004 10:45:03 AM
ELE04-01553 Permanent Service9/24/20049/24/20049/24/2004 12:00:00 AMAPASS
p/s u/g n ok
ELE04-02925 Electrical Rough-In9/23/20049/24/20049/24/2004 12:00:00 AMAPASS
###-#### - allen ok cover ri 9/24/2004 10:06:57 AM
ELE04-02925 Permanent Service9/23/20049/24/20049/24/2004 12:00:00 AMAPASS
###-#### - allen
p/s u/g n ok 9/24/2004 10:07:14 AM
ELE04-02810 Final9/23/20049/24/20049/24/2004 12:00:00 AMAPASS
roy or dena; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok final note survey straping conduit at controller & emt to flex changes 9/24/2004 8:57:32 AM
ELE04-02810 Final9/23/20049/24/20049/24/2004 12:00:00 AMAPASS
roy or dena; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok final note survey straping conduit at controller & emt to flex changes 9/24/2004 8:57:32 AM
ELE04-00509 Final9/23/20049/24/20049/24/2004 12:00:00 AMAPASS
This is a cleanroom tool that was moved from Fab 4A to Fab 4B.; Phone #: ###-#### Internet Inspection Request from: Eric Landberg ok final 9/24/2004 8:46:55 AM
ELE04-02705 Electrical Rough-In9/23/20049/24/20049/24/2004 12:00:00 AMPCANC
We will meet you with the key, please give us 30 minute's notice.Thanks!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell wrong type inspection 9/24/2004 4:10:02 PM
ELE04-02715 Rough-In Permanent Service9/21/20049/24/20049/24/2004 12:00:00 AMPFAIL
We installed a new 20 amp 120 volt circuit in EMT from the panel behind the stage to a receptacle on the ceiling beam above the stage in the sanctuary. We extended an existing 120 volt circuit to a new receptacle for the projector screen. See Eldon or Jim onsite, please.Customer will be there at 1:00 PM for remainder of afternoon.Thanks!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell called they are not on site called - dan to have his people here to show us the work 9/24/2004 1:06:18 PM
ELE04-02837 Final9/24/20049/24/20049/24/2004 12:00:00 AMPPASS
lloyd; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok final 9/24/2004 4:10:42 PM
ELE04-02820 Final9/24/20049/24/20049/24/2004 12:00:00 AMPFAIL
lloyd; Phone #: ###-#### Internet Inspection Request from: Barbara Moore no access they tile in front of store called left message 9/24/2004 1:49:26 PM
ELE04-02044 Electrical Rough-In9/24/20049/24/20049/24/2004 12:00:00 AMPCANC
Added A/C Circuits & receptacles In bldgs. #1060, apts. 25,26,27,28 & 1080, apts. 29, 30, 31, 32.; Phone #: ###-#### Internet Inspection Request from: Dana Moyer wrong type inspection 9/24/2004 12:34:32 PM
ELE04-02057 Rough-In Permanent Service9/24/20049/24/20049/24/2004 12:00:00 AMPCANC
vivian-- ###-#### done 8/11/04 9/24/2004 12:44:23 PM
ELE04-02056 Rough-In Permanent Service9/24/20049/24/20049/24/2004 12:00:00 AMPCANC
vivian ###-#### done 8/18/04 by 412 9/24/2004 12:45:06 PM
ELE04-02044 Final9/24/20049/24/20049/24/2004 12:00:00 AMPPASS
ok final
ELE04-02705 Permanent Service9/24/20049/24/20049/24/2004 12:00:00 AMPPASS
passed & sticked by 432 8/11/04
p/s u/g n ok
ELE04-02705 Final9/24/20049/24/20049/24/2004 12:00:00 AMPPASS
ok final