FIR04-00196
| FIR-Aging Inspection | 9/24/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | | FAIL |
|
|
per john with fire sentry this job has ben canceled. I told him to contact mary to get permit voided. 9/24/2004 12:30:32 PM
|
FIR04-00196
| FIR-Aging Inspection | 9/24/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | | FAIL |
|
|
per john with fire sentry this job has ben canceled. I told him to contact mary to get permit voided. 9/24/2004 12:30:32 PM
|
FIR04-00376
| FIR-Aging Inspection | 9/24/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | | NR |
|
|
wip 9/24/2004 7:51:41 AM
|
FIR04-00518
| INSP-Final Inspection | 9/24/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | A | PASS |
|
|
fire sprinklers finaled
|
BLD04-01657
| FIRE-Final Inspection | 9/23/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | A | PASS |
|
|
Fire life safety finaled 9/24/2004 10:07:11 AM
|
BLD04-02105
| FIRE-Final Inspection | 9/23/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 9/23/2004 at 4:29:16 PM. Contact: ###-####. Per Troy No Fire inspection needed///9/24/04 BAS
|
BLD04-01819
| FIRE-Sprinkler Rough-in | 9/23/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | A | CANC |
|
|
I spoke to dennis about there is to be no fire signoffs until the sprinklers in the canopies and the fire alarm system has been installed and approved. 9/24/2004 12:20:19 PM
|
BLD01-02245
| FIRE-Final Inspection | 9/21/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | A | CANC |
|
|
###-#### jake Cancelled by troy cobbley, to be rescheduled for monday per rick jackson 9/24/2004 9:36:03 AM
|
FIR04-00256
| INSP-Final Inspection | 9/22/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | A | FAIL |
|
|
provide smoke detectors in new corridor in area E and D 9/24/2004 9:09:18 AM
|
MIS04-00207
| FIR-Final | 9/23/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | A | PASS |
|
|
fire life safety finaled 9/24/2004 2:46:36 PM
|
FIR04-00505
| INSP-Final Inspection | 9/23/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | A | FAIL |
|
|
Approved plans not on site. Per Adam they are in the principals office. The principal, Robert Wehde and I looked in his office and could not find the plans. Inspection failed. Re-inspection fee applied to this project. 9/24/2004 9:30:52 AM
|
FIR04-00505
| INSP-Final Inspection | 9/23/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | A | FAIL |
|
|
Approved plans not on site. Per Adam they are in the principals office. The principal, Robert Wehde and I looked in his office and could not find the plans. Inspection failed. Re-inspection fee applied to this project. 9/24/2004 9:30:52 AM
|
FIR04-00553
| INSP-Final Inspection | 9/23/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | A | PART |
|
|
Need verification that the sprinkler system has annual inspection up to date. 9/24/2004 3:26:20 PM
|
BLD04-01018
| FIRE-Final Inspection | 9/23/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | A | FAIL |
|
|
jim; Phone #: ###-#### Repair the exit sign at the north exit and test the two duct smoke detectors (contractor was not on site). 9/24/2004 11:00:54 AM
|
FIR04-00407
| INSP-Final Inspection | 9/24/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | A | PASS |
|
|
fire alarm finaled
|
FIR04-00238
| INSP-Final Inspection | 9/24/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | P | PASS |
|
|
Fire alarm system finaled
|
BLD03-02403
| FIRE-Final Inspection | 9/24/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | P | PASS |
|
|
Fire life safety finaled
|
FIR04-00157
| INSP-Final Inspection | 9/24/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | P | PASS |
|
|
stage removed per eric. Permit finaled
|
BLD03-02721
| FIRE-Final Inspection | 9/24/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | P | PASS |
|
|
fire life safety finaled
|
FIR04-00563
| INSP-Sprinkler Rough-in/Hydro | 9/23/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | P | CANC |
|
|
Per cliff to be rescheduled for monday 9/24/2004 12:18:22 PM
|
FIR04-00435
| INSP-Final Inspection | 9/23/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | P | FAIL |
|
|
Ceiling mounted a/v's are overspaced. No inspection performed 9/24/2004 4:27:20 PM
|
BLD04-01905
| FIRE-Final Inspection | 9/23/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | P | FAIL |
|
|
Provide final for the fie alarm system. Provide current inspections for the fire extinguishers. Remove tape and tin foil from the sprinkler heads. Test exit signs and emergency lights (electricians said one of the phases had failed to the building, Idaho Power was on the way). Provide emergency light in exit corridor. 9/24/2004 3:33:15 PM
|
BLD04-01908
| FIRE-Final Inspection | 9/23/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | P | FAIL |
|
|
Fire fire alarm permit needs finaled for building. Provide inspection for fire extinguishers. Repair exit sign in exit corridor. Repair emergency light. Separate warehouse from above ceiling concealed space by providing separation. 9/24/2004 2:53:21 PM
|
BLD03-02891
| FIRE-Final Inspection | 9/24/2004 | 9/24/2004 | 9/24/2004 12:00:00 AM | P | PASS |
|
|
life safety finaled 9/24/2004 10:28:34 AM
|