Inspections for the day of: Monday, September 24, 2007.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00134 INSP-Final Inspection9/21/20079/24/20079/25/2007 5:06:46 PMAPART
Overhead rough-in is complete, noted six items in need of correction- see inspection comments for related sprinkler permit FIR07-00106.
FIR07-00106 INSP-Final Inspection9/21/20079/24/20079/25/2007 5:03:13 PMAPART
OH rough-in completed, need to provide flexible fittings for vertical drops to hose connections, also need pressure reducers where system exceeds 100 psi. at the hose valves-see review comments, provide signage at the remote inspectors test connections, repair leakage at the existing UG supply piping, provide weekly pump run schedule or program run timer, need adequate FD roadway access to the pump room.
FIR07-00430 INSP-Final Inspection9/24/20079/24/20079/24/2007 5:32:33 PMPPASS
UG fire supply line permit finaled.
BLD07-00671 FIRE-Final Inspection9/21/20079/24/20079/24/2007 5:20:26 PMPPASS
Fire life safety finaled per inspection completed by K. Roule.
FIR07-00780 INSP-Final Inspection9/24/20079/24/20079/24/2007 5:19:31 PMPPASS
Fire alarm work passed inspection, permit finaled per K. Roule.
FIR07-00446 INSP-Final Inspection9/24/20079/24/20079/24/2007 5:18:35 PMPPASS
Fire sprinkler final inspection passed per K. Roule.
BLD07-00845 FIRE-Final Inspection9/21/20079/24/20079/24/2007 5:17:30 PMPPASS
Fire life safety is acceptable, need to provide signage above the main entry/exit door and install indicator on the egress side.
FIR07-00664 INSP-Final Inspection9/24/20079/24/20079/24/2007 5:15:16 PMPPASS
Fire alarm permit finaled.
FIR07-00620 INSP-Final Inspection9/24/20079/24/20079/24/2007 5:14:29 PMPPASS
Fire sprinkler passed final inspection, permit finaled.
FIR07-00595 INSP-Supply line flush9/21/20079/24/20079/24/2007 5:13:11 PMPPART
UG fire supply line flush completed satisfactory.
FIR07-00416 INSP-Final Inspection9/21/20079/24/20079/24/2007 3:34:48 PMPCANC
Rescheduled.
FIR07-00063 INSP-Final Inspection9/21/20079/24/20079/24/2007 3:34:24 PMPCANC
Rescheduled.
FIR07-00235 INSP-Sprinkler Rough-in/Hydro9/21/20079/24/20079/24/2007 3:33:39 PMPNR
Contractor is not ready for hydrostatic testing.
FIR07-00236 INSP-Sprinkler Rough-in/Hydro9/21/20079/24/20079/24/2007 3:32:22 PMPNR
Hydrostatic test is not ready.
BLD07-02515 FIRE-Final Inspection9/21/20079/24/20079/24/2007 3:26:12 PMPNR
Inspection request intended for a conference, discussed hood permit, interconnection to the building alarm system will require a fire alarm permit, noted any modifications to the existing fire sprinkler system will require a FS permit, discussed door hardware, fire extinguishers, one exit sign to be repaired, and max. occupant loading/signage.
FIR07-00755 INSP-Sprinkler Rough-in/Hydro9/21/20079/24/20079/24/2007 3:21:58 PMAPART
OH rough-in for the new preaction and wet systems completed, noted blocked heads by ductwork over 4' in width will require added heads at five locations, riser is not completed at this time, areas at the drop ceilings are okay for cover, AG hydrostatic testing passed, need to perform 24 hr. pneumatic test on the preaction system.
FIR07-00348 INSP-Sprinkler Rough-in/Hydro9/21/20079/24/20079/24/2007 3:17:51 PMAPART
Seismic upgrade work for the basement level west half as noted on plans is acceptable, no access to the ceiling above the locker room at this time, noted one location not completed, verified main is connected for the new computer and storage room heads.