FIR07-00134
| INSP-Final Inspection | 9/21/2007 | 9/24/2007 | 9/25/2007 5:06:46 PM | A | PART |
|
|
Overhead rough-in is complete, noted six items in need of correction- see inspection comments for related sprinkler permit FIR07-00106.
|
FIR07-00106
| INSP-Final Inspection | 9/21/2007 | 9/24/2007 | 9/25/2007 5:03:13 PM | A | PART |
|
|
OH rough-in completed, need to provide flexible fittings for vertical drops to hose connections, also need pressure reducers where system exceeds 100 psi. at the hose valves-see review comments, provide signage at the remote inspectors test connections, repair leakage at the existing UG supply piping, provide weekly pump run schedule or program run timer, need adequate FD roadway access to the pump room.
|
FIR07-00430
| INSP-Final Inspection | 9/24/2007 | 9/24/2007 | 9/24/2007 5:32:33 PM | P | PASS |
|
|
UG fire supply line permit finaled.
|
BLD07-00671
| FIRE-Final Inspection | 9/21/2007 | 9/24/2007 | 9/24/2007 5:20:26 PM | P | PASS |
|
|
Fire life safety finaled per inspection completed by K. Roule.
|
FIR07-00780
| INSP-Final Inspection | 9/24/2007 | 9/24/2007 | 9/24/2007 5:19:31 PM | P | PASS |
|
|
Fire alarm work passed inspection, permit finaled per K. Roule.
|
FIR07-00446
| INSP-Final Inspection | 9/24/2007 | 9/24/2007 | 9/24/2007 5:18:35 PM | P | PASS |
|
|
Fire sprinkler final inspection passed per K. Roule.
|
BLD07-00845
| FIRE-Final Inspection | 9/21/2007 | 9/24/2007 | 9/24/2007 5:17:30 PM | P | PASS |
|
|
Fire life safety is acceptable, need to provide signage above the main entry/exit door and install indicator on the egress side.
|
FIR07-00664
| INSP-Final Inspection | 9/24/2007 | 9/24/2007 | 9/24/2007 5:15:16 PM | P | PASS |
|
|
Fire alarm permit finaled.
|
FIR07-00620
| INSP-Final Inspection | 9/24/2007 | 9/24/2007 | 9/24/2007 5:14:29 PM | P | PASS |
|
|
Fire sprinkler passed final inspection, permit finaled.
|
FIR07-00595
| INSP-Supply line flush | 9/21/2007 | 9/24/2007 | 9/24/2007 5:13:11 PM | P | PART |
|
|
UG fire supply line flush completed satisfactory.
|
FIR07-00416
| INSP-Final Inspection | 9/21/2007 | 9/24/2007 | 9/24/2007 3:34:48 PM | P | CANC |
|
|
Rescheduled.
|
FIR07-00063
| INSP-Final Inspection | 9/21/2007 | 9/24/2007 | 9/24/2007 3:34:24 PM | P | CANC |
|
|
Rescheduled.
|
FIR07-00235
| INSP-Sprinkler Rough-in/Hydro | 9/21/2007 | 9/24/2007 | 9/24/2007 3:33:39 PM | P | NR |
|
|
Contractor is not ready for hydrostatic testing.
|
FIR07-00236
| INSP-Sprinkler Rough-in/Hydro | 9/21/2007 | 9/24/2007 | 9/24/2007 3:32:22 PM | P | NR |
|
|
Hydrostatic test is not ready.
|
BLD07-02515
| FIRE-Final Inspection | 9/21/2007 | 9/24/2007 | 9/24/2007 3:26:12 PM | P | NR |
|
|
Inspection request intended for a conference, discussed hood permit, interconnection to the building alarm system will require a fire alarm permit, noted any modifications to the existing fire sprinkler system will require a FS permit, discussed door hardware, fire extinguishers, one exit sign to be repaired, and max. occupant loading/signage.
|
FIR07-00755
| INSP-Sprinkler Rough-in/Hydro | 9/21/2007 | 9/24/2007 | 9/24/2007 3:21:58 PM | A | PART |
|
|
OH rough-in for the new preaction and wet systems completed, noted blocked heads by ductwork over 4' in width will require added heads at five locations, riser is not completed at this time, areas at the drop ceilings are okay for cover, AG hydrostatic testing passed, need to perform 24 hr. pneumatic test on the preaction system.
|
FIR07-00348
| INSP-Sprinkler Rough-in/Hydro | 9/21/2007 | 9/24/2007 | 9/24/2007 3:17:51 PM | A | PART |
|
|
Seismic upgrade work for the basement level west half as noted on plans is acceptable, no access to the ceiling above the locker room at this time, noted one location not completed, verified main is connected for the new computer and storage room heads.
|