FIR07-00735
| INSP-Sprinkler Rough-in/Hydro | 9/24/2007 | 9/24/2007 | 9/24/2007 12:41:21 PM | P | PASS |
|
|
Hydro test of the garden dry pipe system passed.
|
BLD05-00633
| FIRE-Final Inspection | 9/21/2007 | 9/24/2007 | 9/24/2007 12:40:45 PM | A | CANC |
|
|
I need the project related fire sprinkler and fire alarm passed prior to life safety.
|
FIR06-00956
| INSP-Final Inspection | 9/21/2007 | 9/24/2007 | 9/24/2007 12:40:11 PM | A | CANC |
|
|
Cancelled due to alarm panel problems.
|
FIR06-00957
| INSP-Final Inspection | 9/21/2007 | 9/24/2007 | 9/24/2007 12:39:44 PM | A | CANC |
|
|
Cancelled due to alarm panel problems.
|
FIR06-00958
| INSP-Final Inspection | 9/21/2007 | 9/24/2007 | 9/24/2007 12:39:26 PM | A | CANC |
|
|
Cancelled due to alarm panel problems.
|
FIR06-00811
| INSP-Alarm Testing | 9/24/2007 | 9/24/2007 | 9/24/2007 12:38:53 PM | P | FAIL |
|
|
The fire alarm panel, after testing between two to six room detectors will automatically silence the sounder bases. I do not know if the panel silences all building alarms. Also the data from one of the tenant rooms is being corrupted by the time it is received at the facp and is causing "wave form" errors at the facp. I spoke to the Pyrotronics technical support and they believe that the silencing problem could be a logic/programming issue. They need to view the program to tell. I stopped the inspection out of concerns that if it is a hardware issue all of the items tested would have to be retested when a new panel is installed. Just to make a note when the main fire alarm panel is reset it takes nearly 7 minutes to return to normal. It also takes around 15 seconds to activate the sounder bases in the rooms. I was told this is due to the size of the system and a slow processor in the fire alarm panel. I spoke to Sam Rogers about these concerns. This entry has been made under this permit only due to none access to the other permits because of their being in the "review status"
|
FIR07-00582
| INSP-Sprinkler Rough-in | 9/21/2007 | 9/24/2007 | 9/24/2007 12:19:34 PM | A | FAIL |
|
|
Work was not complete. Also the dry sidewall heads at the patios need to be reaised or the underside of the deck above lowered.
|
FIR07-00585
| INSP-Sprinkler Rough-in | 9/21/2007 | 9/24/2007 | 9/24/2007 12:18:33 PM | A | PASS |
|
|
The sprinkler piping is ok to cover. The general contractor agreed to provide pictures of the insulation to be placed behind the dry sidewall heads. Also the dry sidewall heads at the patios need to be reaised or the underside of the deck above lowered.
|
BLD05-03391
| FIRE-Final Inspection | 9/18/2007 | 9/24/2007 | 9/24/2007 12:13:21 PM | A | FAIL |
|
|
Boris just needed occupancy for the upstairs area which was going to be alowed per a previous agreement with dave hanniman. Life safety items are ok upstairs except for the exit signs and emergency lights that need to be installed and or repaired. I told boris I could not give him a sign off on the upstairs portion until these items were done.
|
FIR07-00794
| INSP-Sprinkler Rough-in/Hydro | 9/21/2007 | 9/24/2007 | 9/24/2007 12:10:18 PM | A | PASS |
|
|
Sprinkler piping is ok to cover
|
BLD07-01848
| FIRE-Final Inspection | 9/21/2007 | 9/24/2007 | 9/24/2007 12:09:25 PM | A | CANC |
|
|
I spoke to Denon about the attached fire sprinkler permit. He stated it was not within his scope of work. I told him he either needed to complete the work or contact city hall about getting the permit un-attached. No inspection performed.
|
FIR07-00781
| INSP-Sprinkler Rough-in/Hydro | 9/21/2007 | 9/24/2007 | 9/24/2007 9:33:46 AM | A | CANC |
|
|
Re-scheduled hydro, please call 1/2 hour prior to inspection. Charles is the contact, thank you. Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|
FIR07-00783
| INSP-Final Inspection | 9/21/2007 | 9/24/2007 | 9/24/2007 8:33:12 AM | A | FAIL |
|
|
Phone #: ###-#### I did not get a responce from the contact phone number and I could not find job site approved plans. No inspection performed.
|