ELE07-00275
| ELE-Aging Inspection | 9/24/2008 | 9/24/2008 | 9/25/2008 9:57:18 AM | | DONE |
|
|
called, left message to return call
|
ELE08-02604
| Electrical Rough-In | 9/24/2008 | 9/24/2008 | 9/25/2008 5:32:39 AM | P | FAIL |
|
|
Please call James at ###-#### he will meet you there Phone #: ###-#### Internet Inspection Request from: Beka Hereau met contractor, left correction notice, BCC shall have permits on job, plans, BLD & Plumbing, contractor called after left and said he found bld, told to recall with all attached to electrical permit
|
ESC08-00433
| General Inspection | 9/24/2008 | 9/24/2008 | 9/24/2008 4:05:06 PM | A | PART |
|
|
looked ok
|
ESC07-01432
| General Inspection | 9/24/2008 | 9/24/2008 | 9/24/2008 4:04:09 PM | P | PART |
|
|
looked ok
|
ESC08-00457
| General Inspection | 9/24/2008 | 9/24/2008 | 9/24/2008 4:02:29 PM | A | PART |
|
|
looked ok
|
ELE08-02584
| Conference | 9/24/2008 | 9/24/2008 | 9/24/2008 4:01:31 PM | P | DONE |
|
|
Robert Phone #: ###-#### talked about work to be done where walls are opened up, nec requirements, outlet spacing, free conductor, where to get books on wiring, when to call for inspection, no esc this project
|
ELE08-02610
| Final | 9/24/2008 | 9/24/2008 | 9/24/2008 2:55:33 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: John Edwards ok to final, no esc this project
|
ELE08-01960
| Electrical Rough-In | 9/24/2008 | 9/24/2008 | 9/24/2008 1:57:21 PM | P | CANC |
|
|
Temp occupancy for 5th and possibly 4th floor. Phone #: ###-#### Internet Inspection Request from: jesse busack wrong type request, see part final, no esc this project
|
ELE08-01960
| Final | 9/24/2008 | 9/24/2008 | 9/24/2008 1:56:52 PM | P | PART |
|
|
Temp occupancy for 5th and possibly 4th floor. Phone #: ###-#### Internet Inspection Request from: jesse busack part final for 5th floor to allow temp occupancy, initialed card, no esc this project
|
ELE08-02423
| Electrical Rough-In | 9/23/2008 | 9/24/2008 | 9/24/2008 1:26:53 PM | P | PASS |
|
|
JASON BLDG 3 L4 UNITS C2 & E1 Phone #: ###-#### Internet Inspection Request from: Sean DeLacy ric 2 units 4th floor anop
|
ELE08-02545
| Rough-In Permanent Service | 9/23/2008 | 9/24/2008 | 9/24/2008 12:49:10 PM | P | CANC |
|
|
This is ready, electrician is Aaron at ###-#### Phone #: ###-#### Internet Inspection Request from: gary batten called, left message, wrong type request, people don't know anything about job if here or at ramp, said to recall
|
ELE08-01957
| Final | 9/24/2008 | 9/24/2008 | 9/24/2008 12:25:42 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: steve creswell corrections made, ok to final
|
ELE08-02559
| Conference | 9/23/2008 | 9/24/2008 | 9/24/2008 11:36:30 AM | A | DONE |
|
|
Scheduled by a contractor via Hello! on 9/23/2008 at 2:16:23 PM. Contact: ###-####. talked about remodel for hangar, about paint booths, service, distribution, no violations to remain, listing for booths, area classification
|
ELE08-02250
| Conference | 9/23/2008 | 9/24/2008 | 9/24/2008 10:49:27 AM | A | DONE |
|
|
DAVE Phone #: ###-#### Internet Inspection Request from: Sean DeLacy met contractor, ok to saw-cut floor and provide depressed floor and to move false ceiling to allow gear to fit without going in between floor joists, they will either put in small sump pump or curbing in floor, no esc this project
|
ELE08-01957
| Final | 9/23/2008 | 9/24/2008 | 9/24/2008 10:00:09 AM | A | FAIL |
|
|
the door should be open by 8:30. I will be there by 9:00 Phone #: ###-#### Internet Inspection Request from: steve creswell met contractor, left correction notice, NEC 410.16 edge of fixture shall be 12" from edge of storage space- both units, 406.4 receptacle shall be securely mounted-washer shoshone side, 110.22 shall label all disconnects- furnaces, service, 406.5 receptacle faceplate shall completely cover opening west microwave, 344.30 shall strap rmc at riser-service
|
ELE08-02536
| Electrical Rough-In | 9/23/2008 | 9/24/2008 | 9/24/2008 9:04:11 AM | A | PART |
|
|
Requesting a partial underground inspection. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok to cover stem walls east of transformer, ok to cover u/g duct north of transformer to elect room about 120 feet north, looked at block-outs east stem walls
|
ELE08-02592
| Temporary Service | 9/23/2008 | 9/24/2008 | 9/24/2008 8:33:42 AM | A | PASS |
|
|
Requesting an inspection of the temporary power. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty t/s u/g n ok, no esc this project
|
ELE08-02603
| Temporary Service | 9/23/2008 | 9/24/2008 | 9/24/2008 8:23:50 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Therrin Robertson t/s u/g n ok, no esc this project
|