Inspections for the day of: Wednesday, September 24, 2008.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-02839 FIRE-Final Inspection9/23/20089/24/20089/24/2008 4:33:28 PMAPASS
Fire life safety inspection passed.
BLD07-02840 FIRE-Final Inspection9/23/20089/24/20089/24/2008 4:32:57 PMAPASS
Fire life safety finaled.
BLD07-02841 FIRE-Final Inspection9/23/20089/24/20089/24/2008 4:32:12 PMAPASS
Fire life safety passed.
BLD07-02842 FIRE-Final Inspection9/23/20089/24/20089/24/2008 4:31:33 PMAPASS
Life safety finaled.
BLD07-02843 FIRE-Final Inspection9/23/20089/24/20089/24/2008 4:30:29 PMAPASS
Life safety inspection passed.
BLD07-02838 FIRE-Final Inspection9/23/20089/24/20089/24/2008 4:29:29 PMAPASS
Life safety passed.
BLD08-01679 FIRE-Final Inspection9/24/20089/24/20089/24/2008 4:28:20 PMPFAIL
Need to post one fire extinguisher within allowable travel distances, project related fire alarm permit must be finaled prior to final fire life safety approval.
FIR08-00621 INSP-Final Inspection9/22/20089/24/20089/24/2008 4:25:49 PMAFAIL
The fire alarm audible notification shall be a distinctive temporal pattern per NFPA 72 requirements. See also notes #4 and #5 on plan review comments.
FIR08-00239 INSP-Sprinkler Rough-in/Hydro9/23/20089/24/20089/24/2008 4:19:58 PMAPART
See areas on 3rd floor plan marked with today's date, noted two missing hangers, need EC coverage SW heads at the patios due to spacing (head legend does not indicate), pipe sizes on plan must match field install.
FIR08-00516 INSP-Sprinkler Rough-in9/23/20089/24/20089/24/2008 11:17:56 AMAPART
Verified correction notice items are complete per last inspection, pendent heads at the paint mixing room are the correct type however plan legend indicates 286 deg. heads and 155 deg. heads have been installed. Also need to adjust deck insulation blocking one upright head prior to final. Office areas are okay for cover at the drop ceilings.
BLD08-01679 FIRE-Final Inspection9/23/20089/24/20089/24/2008 8:23:19 AMACANC
Can you please call with about a 30 min lead time? Phone #: ###-#### Internet Inspection Request from: Nick Downing Inspection cancelled from web by: Nick Downing
FIR08-00222 INSP-Sprinkler Rough-in/Hydro9/23/20089/24/20089/23/2008 3:21:14 PMACANC
Final Inspection - Contact: Todd Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley