Inspections for the day of: Wednesday, September 24, 2008.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-00445 Aging Inspection9/24/20089/24/200810/2/2008 9:21:33 AM DONE
ESC06-00446 Aging Inspection9/24/20089/24/20089/29/2008 10:46:01 AM DONE
ESC06-00449 Aging Inspection9/24/20089/24/20089/25/2008 10:40:34 AM PASS
Permit expired.
ESC08-00491 General Inspection9/24/20089/24/20089/24/2008 4:14:51 PMPPART
Entrances installed but still need to provide access controls to deliniate the approved construction access.
ESC07-01527 Site Preparation9/24/20089/24/20089/24/2008 3:30:31 PMPPART
Need to protect all drain inlets within the parking lot of the project.
ESC06-00450 Aging Inspection9/24/20089/24/20089/24/2008 2:53:03 PM PASS
ESC06-00450 Site Final9/24/20089/24/20089/24/2008 2:52:55 PMPPASS
ESC08-00658 BMP Violation9/23/20089/24/20089/24/2008 2:21:49 PMPPASS
Issues have benn dealt with.
ESC08-00133 Site Final9/24/20089/24/20089/24/2008 1:24:56 PMPPASS
ESC07-01015 Site Final9/24/20089/24/20089/24/2008 1:24:40 PMPPASS
ESC08-00243 Site Final9/24/20089/24/20089/24/2008 1:24:19 PMPPASS
ESC07-00033 Site Final9/24/20089/24/20089/24/2008 1:24:04 PMPPASS
ESC07-00035 Site Final9/24/20089/24/20089/24/2008 1:23:48 PMPPASS
ESC07-00038 Site Final9/24/20089/24/20089/24/2008 1:23:28 PMPPASS
ESC06-01309 General Inspection9/24/20089/24/20089/24/2008 9:58:22 AMAFAIL
Correction Notice
1. Maintain & install an apprved construction entrances on the site area where access is occuring.
2. Install sediment control at the north west end of project where the stock piles are along the perimeter of the project.

Failure to comply will result in further enforcement. Will rre-inspect on 9/30/08.
ESC07-01450 General Inspection9/24/20089/24/20089/24/2008 9:58:07 AMAFAIL
Correction Notice
1. Maintain & install an apprved construction entrances on the site area where access is occuring.
2. Install sediment control at the north west end of project where the stock piles are along the perimeter of the project.

Failure to comply will result in further enforcement. Will rre-inspect on 9/30/08.
ESC07-01432 General Inspection9/24/20089/24/20089/24/2008 9:57:48 AMAFAIL
Correction Notice
1. Maintain & install an apprved construction entrances on the site area where access is occuring.
2. Install sediment control at the north west end of project where the stock piles are along the perimeter of the project.

Failure to comply will result in further enforcement. Will rre-inspect on 9/30/08.
ESC08-00400 General Inspection9/22/20089/24/20089/24/2008 9:41:40 AMPDONE
Hydro -seeding was applied very lite. Recommended that they strengethen the puondage of mix when they come back to apply the rest of the area along the river.
ESC08-00679 Tracking Control9/24/20089/24/20089/24/2008 8:55:47 AMAFAIL
Correction Notice.
1.Need to install an approved construction entrance.
2. Clean up all tracking off of the hard surfaces.
Will re-inspect on 9/26/08 in the PM.
CAS
ESC08-00490 Random Inspection9/24/20089/24/20089/24/2008 8:28:06 AMAPART
Need to protect or get rid of the stock piles along the chain link fence at the east end of the project. Maintain all Drain Inlets on and surrounding the project area. Will re-inspect on 9/29/08
ESC08-00464 BMP Violation9/24/20089/24/20089/24/2008 8:05:42 AMAFAIL
Correction Notice.
1. Maintain entrance at the North end of the project area. Needs fresh underlayment and approved rock.
Will re-inspect on 9/26/08
CAS