ESC09-00507
| Conference | 9/24/2009 | 9/24/2009 | 9/24/2009 2:52:23 PM | A | DONE |
|
|
Most of the excavation is complete. One additional day remains. Informed RP (Mike) that 1) slopes need to be trackwalk prior to spraying BFM and 2) Soils that have been excavated and transported to the location off of the new Warm Springs Road needs to at least be sprayed with a soils binder. Received a complaint earlier in the day mainly regarding extended work hours and general concerns about what is occurring at this site.
|
ESC08-00577
| Site Final | 9/24/2009 | 9/24/2009 | 9/24/2009 2:11:49 PM | P | PART |
|
|
Bare ground remains at misc. locations but has been seeded, no growth noticed as of yet. Part of total area has been sodded. Do problems observed.
|
ESC09-00579
| General Inspection | 9/24/2009 | 9/24/2009 | 9/24/2009 2:08:59 PM | P | PASS |
|
|
video taken
|
ESC09-00582
| Site Preparation | 9/24/2009 | 9/24/2009 | 9/24/2009 10:03:35 AM | | PASS |
|
|
|