Inspections for the day of: Friday, September 24, 2010.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00610 BMP Violation9/21/20109/24/20109/24/2010 3:20:09 PMPFAIL
Message to RP:
Must use an approved product for storm drain inlet protection. Must remove the external protection and utilize an approved inlet protection. Correction noctice still stands. Will re-inspect on 9/27/2010PM.
ESC10-00723 Site Preparation9/24/20109/24/20109/24/2010 1:49:56 PM NR
MIS10-00099 MIS-Aging Inspection9/24/20109/24/20109/24/2010 1:19:21 PM DONE
Moved to an ESC final.
MIS10-00099 ESC-Final9/24/20109/24/20109/24/2010 1:19:05 PMPPASS
Aquired an ESC permit.
ESC10-00697 Site Preparation9/17/20109/24/20109/24/2010 1:17:39 PMAPASS
ESC10-00495 General Inspection9/20/20109/24/20109/24/2010 11:26:42 AMAPASS
Still utilizing the water truck throughout the day to surpress dust. No issues present.
ESC10-00667 Random Inspection9/24/20109/24/20109/24/2010 11:25:46 AMAPART
Starting to rough grade out the lot and cut in driveway. Site is compliant.
ESC09-00507 General Inspection ESC9/24/20109/24/20109/24/2010 10:48:31 AM FAIL
Issues that were addressed in the previous inspection will be dealt with on 9/30/10 on the next inspection. Also they will be hydro-seeding the entrance on the first week of October. Will re-inspect on 10/4/2010am
ESC10-00719 Site Preparation9/23/20109/24/20109/24/2010 9:23:55 AMAFAIL
Remove sheet rock debris pil. Provide a container for trash debris or place it within an area out of the weather.
ESC10-00709 Site Preparation ESC9/24/20109/24/20109/24/2010 8:54:02 AM PASS
ESC10-00554 Site Preparation9/24/20109/24/20109/24/2010 8:53:48 AM PART
After the excavating company does backfill and removes all excess soil the lot will be under a 2% grade slope. Wi,l re-inspect on 9/27/2010am